TEXAS · WELLS · ROBERTS COUNTY · API 42-393-31263 · DISTRICT 08

Vollmert #2032

Plugged

Roberts County · Mendota NW. (Douglas Lo.) field  · Vertical

Vollmert #2032 (API 42-393-31263) is a plugged well in Roberts County, plugged July 30, 2012, last operated by Apache Corporation.

The RRC has issued 2 drilling permits between 1995 and 2011, permitted to 11,400 ft.

Completion filings report 6 formation tops, including B. Heebner, Douglas, Tonkawa, Granite Wash.

Operator of record

Apache Corporation

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough May 2009
Latest permitApache CorporationDec 29, 2011
11,400
total depth, ft
2
permits on file
Dec 29, 2011
last permit issued
Mar 25, 2012
completed
0
cumulative oil, bbl
161K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1995 THROUGH Oct 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 25, 2012
Shut in
—
Plugged
Jul 30, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vollmert O-14-8494Mendota, NW. (Douglas, Lo.)Apache Corporation100Mar 2012 – Oct 2012
Vollmert G-14-155905Red Deer, NE. (Morrow, Up.)Apache Corporation10161KSep 1995 – Mar 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Inc.Sep 1995 → Jul 1996
  2. 2Burlington Resources Oil&gas Co.Aug 1996 → Apr 1997
  3. 3Cross Timbers Operating CompanyMay 1997 → Feb 1998
  4. 4Amoco Production CompanyMar 1998 → Nov 1998
  5. 5Crescendo Resources, L.P.Dec 1998 → Mar 2000
  6. 6Apache CorporationApr 2000 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
730592-99RecompletionApache CorporationDec 22, 2011Dec 29, 2011Jan 13, 201211,400
436174-99DrillMeridian Oil Inc.May 23, 1995May 23, 1995Jun 14, 199511,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 25, 2012Vollmert O-14-8494Mendota NW. (Douglas Lo.)Apache CorporationPlugged—
May 3, 2005Vollmert G-14-155905Red Deer NE. (Morrow Up.)Apache CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,883 ft elevation.Download CSV →

FormationMD ftSubsea
B. Heebner7,238-4,355
Douglas7,250-4,367
Tonkawa7,937-5,054
Douglas7,962-5,079
Granite Wash8,646-5,763
Granite WashGRANITE WASH B CHEROKEE9,278-6,395
Atoka10,286-7,403
Morrow10,447-7,564

Perforations

Perforated and open-hole intervals.

FromToType
7,3537,363Perforated
9,6349,662Perforated
9,63410,538Perforated
10,51810,538Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37582017.5880 S
8.6254,80012.25650 S
8.6254,80012.5650 S
4.511,3757.875725 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 5, 2012Apr 5, 2012—
00Sep 21, 2005May 24, 2005—
00Nov 30, 1995Oct 5, 1995Yes
00Nov 9, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331263, documented in the API reference.