TEXAS · WELLS · ROBERTS COUNTY · BYRUM "6" LEASE · API 42-393-31332 · DISTRICT 08

Byrum 6 #2

Shut in

Roberts County · Red Deer Creek (Granite Wash) field · Temp Abandoned  · Vertical

Byrum 6 #2 (API 42-393-31332) is a well in Roberts County operated by Bce-Mach Iii LLC, completed December 13, 1996 and listed as temp abandoned on the RRC schedule, shut in January 1, 2016.

The RRC has issued 2 drilling permits between 1996 and 2007, permitted to 11,000 ft.

It was permitted by Cimarex Energy CO. Of Colorado and has since transferred to Bce-Mach Iii LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Albany, Base Hebner, Des Moines, Atoka.

No lease production has been reported under this well’s leases.

Operator of record

Bce-Mach III LLC

Permitted by Cimarex Energy Co. of Colorado; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active – Extension (X)
P-5 last filed
May 18, 2026
Permits on file
10
Phone
(405) 252-8100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsCimarex Energy Co. of Coloradothrough Dec 2015
Latest permitCimarex Energy Co. of ColoradoOct 9, 2007
11,000
total depth, ft
2
permits on file
Oct 9, 2007
last permit issued
Dec 13, 1996
completed
0
cumulative oil, bbl
268K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 13, 1996
Shut in
Jan 1, 2016
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Byrum "6" G-14-161965Red Deer Creek (Granite Wash)Bce-Mach III LLC10268KDec 1996 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Parker & Parsley Development L.PDec 1996 → Aug 1997
  2. 2Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
  3. 3Prize Operating CompanyJul 1999 → Mar 2002
  4. 4Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  5. 5Cimarex Energy Co. of ColoradoMay 2006 → Dec 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
647160-99RecompletionCimarex Energy Co. of ColoradoOct 3, 2007Oct 9, 2007—12,000
450794-99DrillParker & Parsley Development L.PJul 25, 1996Jul 25, 1996Sep 30, 199611,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 13, 1996Byrum 6 G-14-161965Red Deer Creek (Granite Wash)Bce-Mach III LLCTemp Abandoned · shut in Jan 1, 201611,000

Formation tops

As filed on W-2/G-1. Subsea from 2,980 ft elevation.Download CSV →

FormationMD ftSubsea
Albany4,368-1,388
Base Hebner7,011-4,031
Des MoinesDES MOINES G. W.8,584-5,604
Atoka10,630-7,650
13 Finger10,900-7,920

Perforations

Perforated and open-hole intervals.

FromToType
10,10210,106Perforated
10,21810,222Perforated
10,35010,426Perforated
10,50710,587Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,70012.251,800 S
4.511,0007.875420 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 2007May 24, 2007—
00Mar 14, 1997Jan 24, 1997Yes
00Mar 12, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331332, documented in the API reference.