TEXAS · WELLS · ROBERTS COUNTY · BRAINARD -A- LEASE · API 42-393-31361 · DISTRICT 08

Brainard -A- #1

Shut in

Roberts County · Hansford (Morrow Lower) field · Temp Abandoned  · Vertical

Brainard -A- #1 (API 42-393-31361) is a well in Roberts County operated by Complete Oil & Gas Services LLC, completed August 6, 1997 and listed as temp abandoned on the RRC schedule, shut in November 1, 1998.

The RRC has issued 2 drilling permits between 1997 and 1998, permitted to 8,750 ft.

It was permitted by Crescendo Resources, L.P. and has since transferred to Complete Oil & Gas Services LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Kansas City, Cleveland, Morrow.

No lease production has been reported under this well’s leases.

Operator of record

Complete Oil & Gas Services LLC

Permitted by Crescendo Resources, L.P.; the EWA schedule now lists a different operator.

Based in
Perkins, OK
P-5 status
Active (A)
P-5 last filed
Oct 9, 2025
Phone
(405) 788-0433

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleComplete Oil & Gas Services LLC
Production reportsCrescendo Resources, L.P.through Oct 1998
Latest permitCrescendo Resources, L.P.Feb 25, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,750
total depth, ft
2
permits on file
Feb 25, 1998
last permit issued
Aug 6, 1997
completed
0
cumulative oil, bbl
9.29K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 6, 1997
Shut in
Nov 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brainard -A- G-14-165952Hansford (Morrow, Lower)Complete Oil & Gas Services, LLC109.29KAug 1997 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crescendo Resources, L.P.Sep 1997 → Oct 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
472651-99RecompletionCrescendo Resources, L.P.Jan 26, 1998Feb 25, 1998—8,750
458627-99DrillAmoco Production CompanyFeb 13, 1997Mar 18, 1997Jun 9, 19978,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 6, 1997Brainard -A- G-14-165952Hansford (Morrow Lower)Complete Oil & Gas Services LLCTemp Abandoned · shut in Nov 1, 19988,750

Formation tops

As filed on W-2/G-1. Subsea from 3,019 ft elevation.Download CSV →

FormationMD ftSubsea
Kansas City6,286-3,267
Cleveland6,686-3,667
MorrowUPPER MORROW7,930-4,911
MorrowLOWER MORROW8,558-5,539

Perforations

Perforated and open-hole intervals.

FromToType
8,5308,550Perforated
8,5608,580Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,75312.25950 S
4.58,7407.875785 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 2, 1998Sep 18, 1997Yes
00Jan 15, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331361, documented in the API reference.