TEXAS · WELLS · ROBERTS COUNTY · MENDOTA RANCH 63 LEASE · API 42-393-31456 · DISTRICT 08

Mendota Ranch 63 #3063

Shut in

Roberts County · Mendota NW. (Granite Wash) field · Shut In  · Vertical

Mendota Ranch 63 #3063 (API 42-393-31456) is a well in Roberts County operated by Mmgl Txph LLC, completed January 16, 2001 and listed as shut in on the RRC schedule, shut in July 1, 2021.

The RRC has issued one drilling permit, issued January 18, 2000, permitted to 10,050 ft.

It was permitted by Amoco Production Company and has since transferred to Mmgl Txph LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Drown Dolomite, Granite Wash.

Its lease has reported 58.6K barrels of oil and 827K mcf of gas since January 2001, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Mmgl Txph LLC

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jul 24, 2025
Permits on file
10
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl Txph LLC
Production reportsBlackbeard Operating, LLCthrough May 2021
Latest permitAmoco Production CompanyJan 18, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,050
total depth, ft
1
permits on file
Jan 18, 2000
last permit issued
Jan 16, 2001
completed
58.6K
cumulative oil, bbl
827K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 16, 2001
Shut in
Jul 1, 2021
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mendota Ranch 63 O-14-7391Mendota, NW. (Granite Wash)Mmgl Txph, LLC258.6K827KJan 2001 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 2001 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → Feb 2020
  3. 3Blackbeard Operating, LLCMar 2020 → May 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
491088-99DrillAmoco Production CompanyJan 14, 2000Jan 18, 2000Nov 30, 200010,050

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 16, 2001Mendota Ranch 63 O-14-7391Mendota NW. (Granite Wash)Mmgl Txph LLCShut In · shut in Jul 1, 202110,050

Formation tops

As filed on W-2/G-1. Subsea from 2,852 ft elevation.Download CSV →

FormationMD ftSubsea
Drown Dolomite4,235-1,383
Granite WashGRANITE WASH-ORANGE9,370-6,518
Granite WashGRANITE WASH-BROWN9,806-6,954

Perforations

Perforated and open-hole intervals.

FromToType
9,5899,594Perforated
9,8859,890Perforated
9,9359,940Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,40912.251,365 S
4.510,0507.875235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 7, 2001Jun 19, 2001Yes
00Jul 23, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331456, documented in the API reference.