TEXAS · WELLS · ROBERTS COUNTY · COURSON RANCH "B" UNIT 14 LEASE · API 42-393-31528 · DISTRICT 08
Courson Ranch B Unit 14 #72
Roberts County · Alpar-Pearson (Brown Dolomite) field · Horizontal · Directional
Courson Ranch B Unit 14 #72 (API 42-393-31528) is a plugged horizontal well in Roberts County, plugged June 19, 2014, last operated by BP America Production Company.
The RRC has issued one drilling permit (amended twice), issued May 17, 2002, permitted to 3,700 ft.
Completion filings report one formation top, including Brown Dolomite.
Operator of record
- Based in
- Denver, CO
- P-5 status
- Active (A)
- P-5 last filed
- Jun 26, 2026
- Permits on file
- 1,623
- Phone
- (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BP America Production Company |
| Production reports | BP America Production Companythrough Apr 2006 |
| Latest permit | BP America Production CompanyMay 17, 2002 |
- 3,700
- total depth, ft
- 3
- permits on file
- May 17, 2002
- last permit issued
- Aug 23, 2002
- completed
- 0
- cumulative oil, bbl
- 219K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2002 THROUGH Jun 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 23, 2002
- Shut in
- —
- Plugged
- Jun 19, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Courson Ranch "B" Unit 14 G-14-192168 | Alpar-Pearson (Brown Dolomite) | BP America Production Company | 1 | 0 | 219K | Aug 2002 – Jun 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1BP America Production CompanyAug 2002 → Apr 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 519927-97 | Drill | BP America Production Company | Nov 14, 2002 | May 17, 2002 | Jul 11, 2002 | 3,700 |
| 519927-98 | Drill | BP America Production Company | Jun 24, 2002 | May 17, 2002 | — | 3,700 |
| 519927-99 | Drill | BP America Production Company | May 13, 2002 | May 17, 2002 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 23, 2002 | Courson Ranch B Unit 14 G-14-192168 | Alpar-Pearson (Brown Dolomite) | BP America Production Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,020 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 3,474 | -454 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,102 | 5,300 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 40 | 24 | — |
| 9.625 | 825 | 12.25 | 405 S |
| 7 | 3,791 | 8.5 | 182 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 12, 2003 | Nov 1, 2002 | Yes |
| 00 | Jan 10, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-31528 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-31528 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39331528, documented in the API reference.