TEXAS · WELLS · ROBERTS COUNTY · WATERFIELD LEASE · API 42-393-31710 · DISTRICT 08

Waterfield #4

Shut in

Roberts County · Mendota NW. (Granite Wash) field · Temp Abandoned  · Vertical

Waterfield #4 (API 42-393-31710) is a well in Roberts County operated by Unit Petroleum Company, completed June 29, 2005 and listed as temp abandoned on the RRC schedule, shut in January 1, 2013.

The RRC has issued 2 drilling permits between 2005 and 2014, permitted to 11,266 ft.

Completion filings report 6 formation tops, including Douglas, Des Moines, Granite Wash, Atoka.

Its lease has reported 4.95K barrels of oil and 194K mcf of gas since June 2005, with no volume in the three years through April 2026.

Operator of record

Unit Petroleum Company

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Jan 13, 2025
Permits on file
1,100
Phone
(918) 493-7700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnit Petroleum Company
Production reportsUnit Petroleum Companythrough Nov 2014
Latest permitUnit Petroleum CompanyJan 2, 2014
11,266
total depth, ft
2
permits on file
Jan 2, 2014
last permit issued
Jun 29, 2005
completed
4.95K
cumulative oil, bbl
194K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2005 THROUGH Nov 2014

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 29, 2005
Shut in
Jan 1, 2013
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waterfield G-14-213178Mendota, NW. (Granite Wash)Unit Petroleum Company14.95K194KJun 2005 – Nov 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyAug 2005 → Nov 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
775918-99RecompletionUnit Petroleum CompanyDec 18, 2013Jan 2, 2014—11,300
601217-99DrillUnit Petroleum CompanyMay 25, 2005May 26, 2005Jun 5, 200511,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 29, 2005Waterfield G-14-213178Mendota NW. (Granite Wash)Unit Petroleum CompanyTemp Abandoned · shut in Jan 1, 201311,266

Formation tops

As filed on W-2/G-1. Subsea from 2,834 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas6,994-4,160
Des Moines9,160-6,326
Granite Wash9,543-6,709
AtokaATOKA LIME10,625-7,791
13 Finger10,695-7,861
Morrow10,890-8,056

Perforations

Perforated and open-hole intervals.

FromToType
9,6969,705Perforated
9,99310,006Perforated
10,08510,092Perforated
10,19410,205Perforated
10,38510,418Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,19112.251,320 S
5.511,2667.75390 S
5.511,2667.875390 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 14, 2007Sep 20, 2007—
00Apr 4, 2006Nov 3, 2005Yes
00Jan 11, 2006——

Well logs

The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.

Open the RRC's log search for this well ↗

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331710, documented in the API reference.