TEXAS · WELLS · ROBERTS COUNTY · OSBORNE 37 LEASE · API 42-393-31850 · DISTRICT 08
Osborne 37 #2
Roberts County · Red Deer Creek (Granite Wash) field · Temp Abandoned · Vertical
Osborne 37 #2 (API 42-393-31850) is a well in Roberts County operated by Bce-Mach Iii LLC, completed November 10, 2006 and listed as temp abandoned on the RRC schedule, shut in February 1, 2018.
The RRC has issued 2 drilling permits (amended once) between 2006 and 2014, permitted to 10,950 ft.
It was permitted by Cimarex Energy CO. and has since transferred to Bce-Mach Iii LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Brown Dolomite, Cherokee "E", Cherokee "G", Morrow.
Its lease has reported 3.05K barrels of oil and 215K mcf of gas since November 2006, with no volume in the three years through April 2026.
Operator of record
Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.
- Based in
- Oklahoma City, OK
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 18, 2026
- Permits on file
- 10
- Phone
- (405) 252-8100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bce-Mach III LLC |
| Production reports | Bce-Mach III LLCthrough Oct 2019 |
| Latest permit | Cimarex Energy Co.Sep 24, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,950
- total depth, ft
- 3
- permits on file
- Sep 24, 2014
- last permit issued
- Nov 10, 2006
- completed
- 3.05K
- cumulative oil, bbl
- 215K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Oct 2019
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 10, 2006
- Shut in
- Feb 1, 2018
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Osborne 37 G-14-223695 | Red Deer Creek (Granite Wash) | Bce-Mach III LLC | 1 | 3.05K | 215K | Nov 2006 – Oct 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cimarex Energy Co. of ColoradoNov 2006 → Oct 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 794304-99 | Recompletion | Cimarex Energy Co. | Aug 15, 2014 | Sep 24, 2014 | — | 11,500 |
| 620705-98 | Drill | Cimarex Energy Co. | Dec 20, 2006 | Jun 13, 2006 | Aug 25, 2006 | 11,500 |
| 620705-99 | Drill | Cimarex Energy Co. | Jun 9, 2006 | Jun 13, 2006 | Aug 25, 2006 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 10, 2006 | Osborne 37 G-14-223695 | Red Deer Creek (Granite Wash) | Bce-Mach III LLC | Temp Abandoned · shut in Feb 1, 2018 | 10,950 |
Formation tops
As filed on W-2/G-1. Subsea from 2,904 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 4,318 | -1,414 |
| Cherokee "E" | 9,817 | -6,913 |
| Cherokee "G" | 9,954 | -7,050 |
| Morrow | 10,540 | -7,636 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,960 | 10,130 | Perforated |
| 10,257 | 10,420 | Perforated |
| 10,471 | 10,500 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,490 | 11 | 900 S |
| 5.5 | 10,935 | 7.875 | 240 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 18, 2007 | Mar 28, 2007 | — |
| 00 | Apr 16, 2007 | Dec 6, 2006 | Yes |
| 00 | Jan 9, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-393-31850 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-393-31850 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39331850, documented in the API reference.