WELL · 42-393-31930 · DISTRICT 10

Payne Ranch Gas Unit #2

Y

Roberts County · RFC (Morrow Upper) field · Producing  · Directional

Payne Ranch Gas Unit #2 (API 42-393-31930) is a well in Roberts County operated by BE Anadarko II LLC, completed April 19, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 26, 2007, permitted to 10,500 ft.

It was permitted by Range Production Company and has since transferred to BE Anadarko II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Brown Dolomite, Tonkawa, Cleveland.

Its lease has reported 134K barrels of oil and 1.54M mcf of gas since April 2007, last reporting in July 2026.

Operator of record

BE Anadarko II LLC

Permitted by Range Production Company; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active (A)
P-5 last filed
Nov 19, 2025
Permits on file
2
Phone
(917) 204-3126

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBE Anadarko II LLC
Production reportsBE Anadarko II, LLCthrough Apr 2026
Latest permitRange Production CompanyJan 26, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Jan 26, 2007
last permit issued
Apr 19, 2007
completed
134K
cumulative oil, bbl
1.54M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 19, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Payne Ranch Gas Unit O-14-8094RFC (Morrow, Upper)BE Anadarko II, LLC1134K1.54MApr 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 32,607 · prior 12 35,926(-9%)

02K4K6K202420252026

Oil, barrels lease total

Last 12 months 1,114 · prior 12 901(+24%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Range Production CompanyApr 2007 → Jun 2014
  2. 2Range Production Company, LLCJul 2014 → Dec 2017
  3. 3Winright Resources Operating,llcJan 2018 → Jul 2022
  4. 4BE Anadarko II, LLCAug 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
632299-98DrillRange Production CompanyOct 16, 2009Jan 26, 2007Mar 15, 200710,500
632299-99DrillRange Production CompanyJan 22, 2007Jan 26, 2007Mar 15, 200710,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-8094————

Formation tops

As filed on W-2/G-1. Subsea from 2,576 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,484-908
Tonkawa6,524-3,948
Cleveland7,251-4,675

Perforations

Perforated and open-hole intervals.

FromToType
8,8588,878Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,80512.251,000 S
5.59,6527.875255 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 7, 2010Apr 14, 2008Yes
00Apr 6, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39331930, documented in the API reference.