TEXAS · WELLS · ROBERTS COUNTY · FLOWERS 78 LEASE · API 42-393-32297 · DISTRICT 08

Flowers 78 #4H

Plugged

Roberts County · Lard Ranch (Granite Wash -C-) field  · Horizontal

Flowers 78 #4H (API 42-393-32297) is a plugged horizontal well in Roberts County, plugged January 12, 2024, last operated by Unbridled Resources LLC.

The RRC has issued one drilling permit (amended twice), issued March 30, 2010, permitted to 18,000 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Unbridled Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Granite Wash, Morrow, Mississippian.

Operator of record

Unbridled Resources LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 17, 2025
Permits on file
6
Phone
(318) 751-3917

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnbridled Resources LLC
Production reportsUnbridled Resources, LLCthrough Jan 2024
Latest permitChesapeake Operating, Inc.Mar 30, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

18,000
total depth, ft
3
permits on file
Mar 30, 2010
last permit issued
Mar 17, 2011
completed
0
cumulative oil, bbl
1.32M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Jan 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 17, 2011
Shut in
—
Plugged
Jan 12, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Flowers 78 G-14-259618Lard Ranch (Granite Wash -C-)Unbridled Resources, LLC101.32MSep 2010 – Jan 2024

Gas, mcf lease total

Last 12 months 0 · prior 12 0

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Mar 2011 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Jun 2016
  3. 34P Energy Texas, LLCJul 2016 → Oct 2020
  4. 4Unbridled Resources, LLCNov 2020 → Jan 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
693612-97DrillChesapeake Operating, Inc.Jun 22, 2010Mar 30, 2010Aug 13, 201018,000
693612-98DrillChesapeake Operating, Inc.May 21, 2010Mar 30, 2010Aug 13, 201018,000
693612-99DrillChesapeake Operating, Inc.Mar 29, 2010Mar 30, 2010Aug 13, 201018,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 17, 2011Flowers 78 G-14-259618Lard Ranch (Granite Wash -C-)Unbridled Resources LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,783 ft elevation.Download CSV →

FormationMD ftSubsea
Granite WashGRANITE WASH C8,803-6,020
Morrow9,061-6,278
MississippianMISSISSIPPI9,674-6,891

Perforations

Perforated and open-hole intervals.

FromToType
8,92412,933Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,49612.251,350 S
78,9608.75395 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 24, 2012Jun 15, 2011—
00Apr 21, 2011Nov 17, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39332297, documented in the API reference.