WELL · 42-393-32620 · DISTRICT 10

W. McMordie 127 #1

Y

Roberts County · St. Clair (Granite Wash) field · Producing  · Vertical

W. Mcmordie 127 #1 (API 42-393-32620) is a well in Roberts County operated by Texakoma E & P LLC, completed April 17, 2022 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 14, 2014, permitted to 11,500 ft.

Completion filings report 10 formation tops, including Douglas, Albany Dolomite - H2s Corrosive, Brown Dolomite, Council Grove.

Its lease has reported 52.9K barrels of oil and 651K mcf of gas since November 2014, last reporting in July 2026.

Operator of record

Texakoma E & P LLC

Based in
Plano, TX
P-5 status
Active – Extension (X)
P-5 last filed
Nov 24, 2025
Permits on file
102
Phone
(972) 701-9106

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexakoma E & P LLC
Production reportsTexakoma E & P, LLCthrough Mar 2026
Latest permitTexakoma E & P, LLCJul 14, 2014
11,500
total depth, ft
1
permits on file
Jul 14, 2014
last permit issued
Apr 17, 2022
completed
52.9K
cumulative oil, bbl
651K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 17, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
W. McMordie 127 O-14-9476St. Clair (Granite Wash)Texakoma E & P, LLC152.9K651KNov 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 109,444 · prior 12 83,062(+32%)

010K20K202420252026

Oil, barrels lease total

Last 12 months 4,782 · prior 12 3,385(+41%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texakoma E & P, LLCNov 2014 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
788784-99DrillTexakoma E & P, LLCJun 5, 2014Jul 14, 2014Aug 30, 201411,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-9476————

Formation tops

As filed on W-2/G-1. Subsea from 2,622 ft elevation.Download CSV →

FormationMD ftSubsea
Douglas6,502-3,880
Albany Dolomite - H2S Corrosive——
Brown DolomiteBROWN DOLOMITE - PRODUCTIVE; H2S——
Council Grove——
Lecompton (Douglas) - H2S Corros——
Moore County LimeMOORE COUNTY LIME - H2S CORROSIV——
Quinduno Brown Dolomite - H2S Co——
Tonkawa——
Toronto——
WolfcampWOLFCAMP - H2S CORROSIVE——

Perforations

Perforated and open-hole intervals.

FromToType
7,6287,634Perforated
7,6447,650Perforated
7,6687,672Perforated
7,7267,730Perforated
7,7467,752Perforated
7,7547,758Perforated
8,9728,982Perforated
9,1009,120Perforated
9,3469,348Perforated
9,3529,356Perforated
9,4249,430Perforated
9,4469,450Perforated
10,97210,986Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,10017.51,190 S
9.6255,48512.25590 S
5.511,2208.75975 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 10, 2022Apr 28, 2022—
00Aug 15, 2016May 24, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39332620, documented in the API reference.