WELL · 42-395-30359 · DISTRICT 5
Mitchell Unit II #3
Robertson County · Bald Prairie (Cotton Valley) field · Vertical
Mitchell Unit II #3 (API 42-395-30359) is a well in Robertson County operated by Cross Timbers Operating Company, completed November 30, 2000.
The RRC has issued 2 drilling permits between 1989 and 2000, permitted to 13,200 ft.
Completion filings report 5 formation tops, including Pettit, Travis Peak, Bossier, Cotton Valley.
No lease production has been reported under this well’s leases.
Operator of record
Cross Timbers Operating Company
- Based in
- Fort Worth, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 20, 2001
- Permits on file
- 663
- Phone
- (817) 870-2800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cross Timbers Operating Company |
| Production reports | Hilcorp Energy Companythrough Feb 2026 |
| Latest permit | Cross Timbers Operating CompanyNov 30, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,200
- total depth, ft
- 2
- permits on file
- Nov 30, 2000
- last permit issued
- Nov 30, 2000
- completed
- 0
- cumulative oil, bbl
- 3.51M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 30, 2000
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mitchell Unit II G-5-133578 | Bald Prairie (CV-Lime) | Hilcorp Energy Company | 1 | 0 | 3.51M | Jan 1993 – Jul 2026 |
| Mitchell Unit II G-5-180625 | Bald Prairie (CV-Bossier) | Cross Timbers Operating Company | 1 | 0 | 0 | Nov 2000 – Feb 2001 |
| Mitchell Unit II G-5-180629 | Bald Prairie (Cotton Valley) | Cross Timbers Operating Company | 1 | 0 | 0 | Nov 2000 – Feb 2001 |
Gas, mcf lease total
Last 12 months 45 · prior 12 28(+61%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pg&e Resources CompanyJan 1993 → Oct 1994
- 2Dalen Resources Oil & Gas Co.Nov 1994 → Dec 1995
- 3Enserch Exploration, IncJan 1996 → Mar 1998
- 4Eex CorporationApr 1998 → Apr 1998
- 5Cross Timbers Operating CompanyMay 1998 → May 2001
- 6XTO Energy Inc.Jun 2001 → Nov 2023
- 7Hilcorp Energy CompanyJan 2024 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 501400-99 | Recompletion | Cross Timbers Operating Company | Oct 30, 2000 | Nov 30, 2000 | Oct 31, 2000 | 13,200 |
| 364946-99 | Drill | Pg&e Resources Company | Oct 10, 1989 | Oct 11, 1989 | — | 13,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-5-133578 | — | — | — | — |
| — | — G-5-180625 | — | — | — | — |
| — | — G-5-180629 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 390 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettit | 8,032 | -7,642 |
| Travis Peak | 8,327 | -7,937 |
| Bossier | 11,260 | -10,870 |
| Cotton ValleyCOTTON VALLEY LIME | 12,761 | -12,371 |
| Cotton ValleyCOTTON VALLEY LM | 12,762 | -12,372 |
| Cotton ValleyCOTTON VALLEY LM. | 12,762 | -12,372 |
| Cotton Valleylm | 12,762 | -12,372 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,565 | 12,888 | Perforated |
| 11,032 | 11,474 | Perforated |
| 11,632 | 11,868 | Perforated |
| 12,790 | 12,888 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,108 | 12.25 | 1,435 S |
| 5.5 | 13,200 | 8.75 | 1,410 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 1, 2003 | Jul 21, 2003 | — |
| 00 | Jun 14, 2001 | Apr 6, 2001 | — |
| 00 | Apr 19, 2001 | Jan 22, 2001 | — |
| 00 | Apr 9, 2001 | Jan 22, 2001 | — |
| 00 | Mar 26, 2001 | Jan 22, 2001 | — |
| 00 | Feb 8, 2001 | — | — |
| 00 | May 23, 1990 | May 4, 1990 | Yes |
| 00 | Mar 12, 1990 | Feb 8, 1990 | Yes |
| 00 | Mar 7, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-395-30359 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-395-30359 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39530359, documented in the API reference.