WELL · 42-395-30459 · DISTRICT 3

Skeagh-Walker Unit #1

Plugged

Robertson County · Giddings (Austin Chalk-3) field  · Horizontal

Skeagh-Walker Unit #1 (API 42-395-30459) is a plugged horizontal well in Robertson County, plugged May 15, 2017, last operated by Wildhorse Resources Mngt CO LLC.

The RRC has issued one drilling permit (amended once), issued April 1, 1996, permitted to 8,100 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Wildhorse Resources Mngt CO LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Buda, Georgetown.

Its lease has reported 276K barrels of oil and 284K mcf of gas since August 1996, last reporting in September 2017.

Operator of record

Wildhorse Resources Mngt Co LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Inactive (I)
P-5 last filed
May 2, 2019
Permits on file
350
Phone
(405) 935-3100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWildhorse Resources Mngt Co LLC
Production reportsAnadarko E&P Onshore LLCthrough May 2016
Latest permitUnion Pacific Resources CompanyApr 1, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,100
total depth, ft
2
permits on file
Apr 1, 1996
last permit issued
Aug 22, 1996
completed
276K
cumulative oil, bbl
284K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1996 THROUGH Sep 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 22, 1996
Shut in
—
Plugged
May 15, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Skeagh-Walker Unit O-3-23058Giddings (Austin Chalk-3)Wildhorse Resources Mngt Co, LLC1276K284KAug 1996 – Sep 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanySep 1996 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Apr 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446374-98DrillUnion Pacific Resources CompanySep 16, 1996Apr 1, 1996—8,100
446374-99DrillUnion Pacific Resources CompanyMar 27, 1996Apr 1, 1996Jul 18, 19968,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-23058————

Formation tops

As filed on W-2/G-1. Subsea from 327 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,807-6,480
Buda7,540-7,213
Georgetown7,639-7,312

Perforations

Perforated and open-hole intervals.

FromToType
6,84211,760Perforated
7,67011,924Perforated
7,74811,930Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,48814.75580 S
7.6257,6709.875440 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 18, 1996Sep 16, 1996Yes
00Oct 14, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39530459, documented in the API reference.