TEXAS · WELLS · ROBERTSON COUNTY · WATTS, MARY J. GAS UNIT LEASE · API 42-395-30834 · DISTRICT 05

Watts Mary J. Gas Unit #5

On schedule

Robertson County · Bald Prairie (CV Consolidated) field · Producing  · Vertical

Watts Mary J. Gas Unit #5 (API 42-395-30834) is a well in Robertson County operated by Hilcorp Energy Company, completed December 24, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 18, 2003, permitted to 12,950 ft.

It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Pettit, Travis Peak, Cotton Valley.

Its lease has reported 137 barrels of oil and 1.67M mcf of gas since December 2003, last reporting volume in August 2026.

Operator of record

Hilcorp Energy Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)RRC P-5 file of Oct 22, 2026
P-5 last filed
Mar 27, 2026
Permits on file
3,460
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2026
Latest permitXTO Energy Inc.Sep 18, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,950
total depth, ft
1
permits on file
Sep 18, 2003
last permit issued
Dec 24, 2003
completed
137
cumulative oil, bbl
1.67M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · DEC 2003 THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 24, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Watts, Mary J. Gas Unit G-5-199724Bald Prairie (CV Consolidated)Hilcorp Energy Company11371.67MDec 2003 – Aug 2026

Gas, mcf lease total

Last 12 months 8,671 · prior 12 12,231(-29%)

01K2K202420252026

Wells named Watts Mary J. Gas Unit

Hilcorp Energy Company's other wells filed under this lease name in Robertson County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Operator on the lease's P-4

Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.

OperatorFromTo
Hilcorp Energy CompanyJan 1, 2024today
XTO Energy Inc.Dec 24, 2003Jan 1, 2024

Reporting production

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Dec 2003 → Dec 2023
  2. 2Hilcorp Energy CompanyJan 2024 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
536527-99DrillXTO Energy Inc.Sep 17, 2003Sep 18, 2003Oct 31, 200313,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 24, 2003Watts Mary J. Gas Unit G-5-199724Bald Prairie (CV Consolidated)Hilcorp Energy CompanyProducing12,950

Formation tops

As filed on W-2/G-1. Subsea from 395 ft elevation.Download CSV →

FormationMD ftSubsea
BMA4,965-4,570
Pettit7,958-7,563
Travis Peak8,256-7,861
Cotton ValleyCOTTON VALLEY SAND10,789-10,394
Bossier11,128-10,733
Cotton ValleyCOTTON VALLEY LIME12,696-12,301

Perforations

Perforated and open-hole intervals.

FromToType
11,20112,785Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,36912.25465 S
711,1328.751,060 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 31, 2004Jan 26, 2004Yes
00Mar 11, 2004——

Well logs

1 log loaded from the RRC's log index, the latest received Jan 17, 2007. Resistivity, Spontaneous potential.

Click a log to get its files from the RRC (free account). It opens in a new tab on the RRC's log search for this well, which lists each file to view or download; the RRC has no address for a single file.

Logas describedFiles Intervalft, as filedDatereceivedSizeMB
ResistivityARRAY INDUCTION GASMMA RAY - SP FINAL COMPOSITESpans BossierTIFF11,142 to 12,974Jan 17, 2007run Nov 15, 2003—

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39530834, documented in the API reference.