TEXAS · WELLS · ROBERTSON COUNTY · MISCHER "D" LEASE · API 42-395-30890 · DISTRICT 05
Mischer D #3
Robertson County · Wildcat field · Directional
Mischer D #3 (API 42-395-30890) is a plugged well in Robertson County, plugged October 7, 2011, last operated by Anadarko Petroleum Corporation.
The RRC has issued one drilling permit (amended 3 times), issued March 16, 2004, permitted to 15,000 ft.
Completion filings report 6 formation tops, including Bossier, Cotton Valley, Massive Anhydrite (marker), Pettit.
Operator of record
Anadarko Petroleum Corporation
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jun 11, 2012
- Permits on file
- 4,004
- Phone
- (832) 636-3130
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anadarko Petroleum Corporation |
| Production reports | none |
| Latest permit | Anadarko Petroleum CorporationJun 8, 2004 |
- 15,000
- total depth, ft
- 4
- permits on file
- Jun 8, 2004
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2004 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 7, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mischer "D" G-5-212521 | Wildcat | Anadarko Petroleum Corporation | 1 | 0 | 0 | Jul 2004 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 543256-96 | Drill | Anadarko Petroleum Corporation | Sep 28, 2005 | Jun 8, 2004 | Jun 15, 2004 | 15,000 |
| 543256-97 | Drill | Anadarko Petroleum Corp. | Jun 8, 2004 | Mar 16, 2004 | Jun 15, 2004 | 14,000 |
| 543256-98 | Drill | Anadarko Petroleum Corp. | Apr 21, 2004 | Mar 16, 2004 | — | 14,000 |
| 543256-99 | Drill | Anadarko Petroleum Corp. | Mar 15, 2004 | Mar 16, 2004 | — | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Mischer D G-5-212521 | Wildcat | Anadarko Petroleum Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 451 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bossier | — | — |
| Cotton Valley | — | — |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | — | — |
| Pettit | — | — |
| Rodessa | — | — |
| Travis Peak | — | — |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,395 | 12.25 | 1,321 S |
| 7 | 12,440 | 8.75 | 533 S |
| 4.5 | — | 6.125 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 2, 2006 | Jul 13, 2005 | Yes |
| 00 | Dec 6, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-395-30890 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-395-30890 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39530890, documented in the API reference.