TEXAS · WELLS · ROBERTSON COUNTY · GRACE LEASE · API 42-395-31051 · DISTRICT 05
Grace #2
Robertson County · Bald Prairie (CV Consolidated) field · Temp Abandoned · Vertical
Grace #2 (API 42-395-31051) is a well in Robertson County operated by Diversified Production LLC, completed March 23, 2006 and listed as temp abandoned on the RRC schedule, shut in March 1, 2021.
The RRC has issued one drilling permit, issued August 11, 2005, permitted to 12,800 ft.
It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Diversified Production LLC on the wellbore schedule.
Completion filings report 9 formation tops, including Austin Chalk, Buda, Massive Anhydrite (marker), Rodessa.
Its lease has reported 22.8K barrels of oil and 660K mcf of gas since March 2006, with no volume in the three years through April 2026.
Operator of record
Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.
- Based in
- Keithville, LA
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 25, 2026
- Permits on file
- 11
- Phone
- (318) 751-3917
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Diversified Production LLC |
| Production reports | Diversified Production LLCthrough Mar 2022 |
| Latest permit | Encana Oil & Gas(usa) Inc.Aug 11, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,800
- total depth, ft
- 1
- permits on file
- Aug 11, 2005
- last permit issued
- Mar 23, 2006
- completed
- 22.8K
- cumulative oil, bbl
- 660K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Mar 2022
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 23, 2006
- Shut in
- Mar 1, 2021
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Grace G-5-218155 | Bald Prairie (CV Consolidated) | Diversified Production LLC | 1 | 22.8K | 660K | Mar 2006 – Mar 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Encana Oil & Gas(usa) Inc.Mar 2006 → Oct 2009
- 2Fortson Oil CompanyNov 2009 → May 2020
- 3CRD Operating, LLCSep 2020 → Feb 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 604786-99 | Drill | Encana Oil & Gas(usa) Inc. | Aug 10, 2005 | Aug 11, 2005 | Feb 17, 2006 | 15,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 23, 2006 | Grace G-5-218155 | Bald Prairie (CV Consolidated) | Diversified Production LLC | Temp Abandoned · shut in Mar 1, 2021 | 12,800 |
Formation tops
As filed on W-2/G-1. Subsea from 447 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 4,380 | -3,933 |
| Buda | 5,164 | -4,717 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 7,100 | -6,653 |
| Rodessa | 7,382 | -6,935 |
| Pettit | 8,060 | -7,613 |
| Travis Peak | 8,290 | -7,843 |
| Knowles Lime | 11,159 | -10,712 |
| BossierBOSSIER SHALE | 11,610 | -11,163 |
| BossierBOSSIER SAND | 11,850 | -11,403 |
| B/Bossier Sand | 12,454 | -12,007 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,389 | 11,393 | Perforated |
| 11,420 | 11,424 | Perforated |
| 11,462 | 11,470 | Perforated |
| 11,682 | 11,692 | Perforated |
| 12,128 | 12,132 | Perforated |
| 12,150 | 12,159 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,530 | 12.25 | 854 S |
| 5.5 | 12,800 | 8.75 | 444 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 20, 2006 | Apr 28, 2006 | Yes |
| 00 | Aug 16, 2006 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received Apr 3, 2009. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Austin Chalk, Buda, Massive Anhydrite (marker), Rodessa, Pettit, Travis Peak, Knowles Lime, Bossier, B/Bossier Sand | TIFF | 2,533 to 12,792 | Apr 3, 2009run Mar 11, 2006 | 8.48 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-395-31051 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-395-31051 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39531051, documented in the API reference.