TEXAS · WELLS · ROBERTSON COUNTY · S. MCLEAN LEASE · API 42-395-31282 · DISTRICT 05

S. McLean #3

Shut in

Robertson County · John Amoruso (Bossier) field · Producing  · Vertical

S. Mclean #3 (API 42-395-31282) is a well in Robertson County operated by Comstock Oil & Gas LLC, completed October 16, 2007 and listed as producing on the RRC schedule, shut in August 1, 2024.

The RRC has issued one drilling permit, issued May 16, 2007, permitted to 16,400 ft.

It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Comstock Oil & Gas LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Glen Rose, Pettit, James Lime, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Comstock Oil & Gas LLC

Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.

Based in
Frisco, TX
P-5 status
Active (A)
P-5 last filed
Jul 28, 2025
Permits on file
239
Phone
(972) 668-8800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleComstock Oil & Gas LLC
Production reportsComstock Oil & Gas, LLCthrough Jul 2024
Latest permitEncana Oil & Gas(usa) Inc.May 16, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,400
total depth, ft
1
permits on file
May 16, 2007
last permit issued
Oct 16, 2007
completed
0
cumulative oil, bbl
2.06M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 16, 2007
Shut in
Aug 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
S. McLean G-5-234052John Amoruso (Bossier)Comstock Oil & Gas, LLC102.06MOct 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 446(-100%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encana Oil & Gas(usa) Inc.Oct 2007 → Sep 2013
  2. 2Covey Park Operating LLCJan 2015 → Aug 2019
  3. 3Comstock Oil & Gas, LLCSep 2019 → Jul 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
637593-99DrillEncana Oil & Gas(usa) Inc.Apr 23, 2007May 16, 2007Jun 8, 200716,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 16, 2007S. McLean G-5-234052John Amoruso (Bossier)Comstock Oil & Gas LLCProducing · shut in Aug 1, 202416,400

Formation tops

As filed on W-2/G-1. Subsea from 458 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose7,795-7,337
PettitPETTET9,670-9,212
James LimeJAMES9,917-9,459
Travis Peak10,482-10,024
Bossier14,387-13,929
Bossier15,550-15,092

Perforations

Perforated and open-hole intervals.

FromToType
14,83814,847Perforated
15,57115,571Perforated
15,87515,882Perforated
16,06516,071Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,95517.512,530 S
9.62510,66512.25675 S
3.516,3984.75565 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 9, 2009Nov 12, 2008—
00Apr 17, 2008Jan 29, 2008Yes
00Mar 27, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39531282, documented in the API reference.