WELL · 42-399-33163 · DISTRICT 7
Clayton -137- #3
Runnels County · Loco Rico (Gardner-A) field · Vertical
Clayton -137- #3 (API 42-399-33163) is a plugged well in Runnels County, plugged June 27, 1989, last operated by 3 S Production Inc..
The RRC has issued one drilling permit, issued March 6, 1984, permitted to 3,800 ft.
It was permitted by Barbee, Inc. and has since transferred to 3 S Production Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including B.Coleman Junction, Dog Bend Lime, Caps Lime, Fry Sand.
Operator of record
Permitted by Barbee, Inc.; the EWA schedule now lists a different operator.
- Based in
- Cisco, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 26, 2026
- Permits on file
- 2
- Phone
- (254) 442-4819
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | 3 S Production Inc. |
| Production reports | none |
| Latest permit | Barbee, Inc.Mar 6, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,800
- total depth, ft
- 1
- permits on file
- Mar 6, 1984
- last permit issued
- Apr 4, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 4, 1984
- Shut in
- —
- Plugged
- Jun 27, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 231570-99 | Drill | Barbee, Inc. | Mar 5, 1984 | Mar 6, 1984 | — | 3,800 |
Formation tops
As filed on W-2/G-1. Subsea from 1,808 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B.coleman Junction | 1,230 | 578 |
| Dog Bend Lime | 3,300 | -1,492 |
| Caps Lime | 3,420 | -1,612 |
| Fry Sand | 3,492 | -1,684 |
| Jennings Sand | 3,606 | -1,798 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,676 | 3,680 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 145 | 11 | 100 S |
| 5.5 | 3,700 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 2, 1984 | Apr 16, 1984 | — |
| 00 | Apr 25, 1984 | Apr 16, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33163 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33163 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39933163, documented in the API reference.