WELL · 42-399-33366 · DISTRICT 7

Wilson A #3

N

Runnels County · Barr Ranch (Jennings Lo.) field  · Vertical

Wilson A #3 (API 42-399-33366) is a well in Runnels County operated by Southeastern Resources Corp., completed December 2, 1984.

The RRC has issued 2 drilling permits between 1984 and 1985, permitted to 4,200 ft.

Completion filings report 6 formation tops, including Canyon, Palo Pinto, Dog Bend, Goen Lime.

Its lease has reported 22.4K barrels of oil and 346K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Southeastern Resources Corp.

Mansfield, TX · P-5 Inactive, filed Nov 21, 2002 · 350 permits on file · (817) 737-4184

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSoutheastern Resources Corp.
Production reportsLakeshore Operating, LLCthrough Apr 2026
Latest permitSoutheastern Resources Corp.Sep 26, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,200
total depth, ft
2
permits on file
Sep 26, 1985
last permit issued
Dec 2, 1984
completed
22.4K
cumulative oil, bbl
346K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 2, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilson "A" O-9-11584Buffalo BluffLakeshore Operating, LLC122.4K346KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 15,039 · prior 12 6,897(+118%)

01K2K3K202420252026

Oil, barrels lease total

Last 12 months 367 · prior 12 512(-28%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Southeastern Resources Corp.Jan 1993 → Aug 2002
  2. 2McClymond, Ltd.Sep 2002 → Feb 2004
  3. 3Alpine Gas Company, LLCMar 2004 → Aug 2006
  4. 4WG Operating, Inc.Sep 2006 → May 2012
  5. 5Halcon Operating Co., Inc.Jun 2012 → Nov 2013
  6. 6Energyquest II, LLCDec 2013 → Mar 2019
  7. 7Flint Oak Energy, LLCApr 2019 → Aug 2024
  8. 8Lakeshore Operating, LLCSep 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
286899-99RecompletionSoutheastern Resources Corp.Sep 26, 1985Sep 26, 1985—4,200
254762-99DrillSoutheastern Resources Corp.Oct 16, 1984Oct 16, 1984—4,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-11584————

Formation tops

As filed on W-2/G-1. Subsea from 1,606 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON REEF2,439-833
Palo Pinto2,891-1,285
Dog Bend3,095-1,489
Goen Lime3,384-1,778
Jennings S.S.3,474-1,868
Jenning Lime3,504-1,898

Perforations

Perforated and open-hole intervals.

FromToType
3,0963,106Perforated
3,4783,483Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7514614300 S
8.6251,14511500 S
4.53,6317.875325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 22, 1985Oct 4, 1985Yes
00Oct 16, 1985——
00Feb 6, 1985Jan 10, 1985—
00Feb 1, 1985Dec 14, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39933366, documented in the API reference.