WELL · 42-399-34384 · DISTRICT 7

Belk #2

N

Runnels County · Chaetetes (Goen) field  · Vertical

Belk #2 (API 42-399-34384) is a well in Runnels County operated by Jrow Energy LLC, completed June 18, 1995.

The RRC has issued 2 drilling permits between 1995 and 2014, permitted to 5,200 ft.

It was permitted by Southcoast Resources, LLC and has since transferred to Jrow Energy LLC on the wellbore schedule.

Completion filings report 13 formation tops, including Palo Pinto, Capps, Goen Marker, Odom.

Its 2 leases have reported 118K barrels of oil and 28.2K mcf of gas since February 1995, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Jrow Energy LLC

Permitted by Southcoast Resources, LLC; the EWA schedule now lists a different operator.

Lubbock, TX · P-5 Y, filed May 4, 2026 · 1 permits on file · (806) 778-6510

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJrow Energy LLC
Production reportsWindow Operating Co., Thethrough May 2020
Latest permitSouthcoast Resources, LLCMay 6, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
2
permits on file
May 6, 2014
last permit issued
Jun 18, 1995
completed
118K
cumulative oil, bbl
28.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 18, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Belk O-9-13739Chaetetes (Goen)Jrow Energy LLC2112K28.2KFeb 1995 – Jul 2026
Belk O-9-18552Norton, E. (Gardner Sand)Jrow Energy LLC15.98K0Nov 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fortson Oil CompanyFeb 1995 → Apr 2004
  2. 2Runnels S.w.d.,inc.Aug 2005 → Apr 2011
  3. 3Southcoast Resources, LLCFeb 2014 → Dec 2015
  4. 4Ridglea Energy I, LLCFeb 2016 → Feb 2018
  5. 5Hardrock Resources Inc.Mar 2018 → Mar 2018
  6. 6Window Operating Co., TheJun 2018 → May 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
783533-99RecompletionSouthcoast Resources, LLCMar 31, 2014May 6, 2014Nov 10, 20135,200
435594-99DrillFortson Oil CompanyMay 8, 1995May 10, 1995Jun 2, 19955,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-13739————
—— O-9-18552————

Formation tops

As filed on W-2/G-1. Subsea from 1,851 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto3,830-1,979
Capps4,072-2,221
Goen Marker4,278-2,427
Odom4,700-2,849
Caddo4,763-2,912
Ellenburger4,850-2,999
Cambrian——
Canyon——
Cisco——
Coleman JunctionCOLEMAN JUNCTION - POSSIBLE WATE——
King——
Problem Zone - 5 Mile Radius Aro——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
4,2894,292Perforated
4,4914,495Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62521411100 S
5.54,7117.87575 S
5.5—7.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 18, 2014Jul 24, 2014—
00Oct 25, 1995Jul 10, 1995Yes
00Jul 24, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39934384, documented in the API reference.