TEXAS · WELLS · RUSK COUNTY · PRICE GAS UNIT LEASE · API 42-401-31085 · DISTRICT 06

Price Gas Unit #2

Shut in

Rusk County · Oak Hill (Cotton Valley) field · Temp Abandoned  · Vertical

Price Gas Unit #2 (API 42-401-31085) is a well in Rusk County operated by Tgnr East Texas LLC, completed January 26, 1981 and listed as temp abandoned on the RRC schedule, shut in December 1, 2014.

The RRC has issued one drilling permit, issued December 1, 1980, permitted to 10,750 ft.

It was permitted by Henderson Clay Products, Inc. and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Its lease has reported 1.73K barrels of oil and 197K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

TGNR East Texas LLC

Permitted by Henderson Clay Products, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Aug 2015
Latest permitHenderson Clay Products, Inc.Dec 1, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,750
total depth, ft
1
permits on file
Dec 1, 1980
last permit issued
Jan 26, 1981
completed
1.73K
cumulative oil, bbl
197K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2015

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 26, 1981
Shut in
Dec 1, 2014
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Price Gas Unit G-6-92895Oak Hill (Cotton Valley)TGNR East Texas LLC11.73K197KJan 1993 – Aug 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Castle Production CompanyJan 1993 → Apr 1997
  2. 2Union Pacific Resources CompanyMay 1997 → Jan 2001
  3. 3Rme Petroleum CompanyFeb 2001 → Nov 2002
  4. 4Anadarko E&P Company LPDec 2002 → Dec 2012
  5. 5Anadarko E&P Onshore LLCJan 2013 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
101317-99DrillHenderson Clay Products, Inc.Dec 1, 1980Dec 1, 1980Dec 6, 198011,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 26, 1981Price Gas Unit G-6-92895Oak Hill (Cotton Valley)TGNR East Texas LLCTemp Abandoned · shut in Dec 1, 201410,750

Perforations

Perforated and open-hole intervals.

FromToType
10,44310,642Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,27912.251,150 S
2.3759,620——
5.510,7508.751,800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 10, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40131085, documented in the API reference.