TEXAS · WELLS · RUSK COUNTY · GARNETT GAS UNIT LEASE · API 42-401-31114 · DISTRICT 06

Garnett Gas Unit #1

Shut in

Rusk County · Oak Hill (Cotton Valley) field · Temp Abandoned  · Vertical

Garnett Gas Unit #1 (API 42-401-31114) is a well in Rusk County operated by Tgnr Gulf Coast LLC, completed May 9, 1987 and listed as temp abandoned on the RRC schedule, shut in August 1, 2015.

The RRC has issued one drilling permit, issued January 29, 1981, permitted to 10,900 ft.

It was permitted by Texaco Inc. and has since transferred to Tgnr Gulf Coast LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Glen Rose, Rodessa, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Gulf Coast LLC

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Gulf Coast LLC
Production reportsCci Gulf Coast Upstream LLCthrough Jul 2015
Latest permitTexaco Inc.Jan 29, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,900
total depth, ft
1
permits on file
Jan 29, 1981
last permit issued
May 9, 1987
completed
0
cumulative oil, bbl
519K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 9, 1987
Shut in
Aug 1, 2015
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garnett Gas Unit G-6-93531Oak Hill (Cotton Valley)TGNR Gulf Coast LLC10519KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mustang Drilling, Inc.Jan 1993 → May 2001
  2. 2Mustang Drilling, Ltd.Jun 2001 → Jul 2004
  3. 3Exco Resources, Inc.Aug 2004 → Mar 2007
  4. 4Exco Partners Operating Ptshp LPApr 2007 → Jun 2008
  5. 5Exco Operating Company, LPJul 2008 → May 2011
  6. 6Archon Resources LLCJun 2011 → Aug 2014
  7. 7Cci Gulf Coast Upstream LLCSep 2014 → Jul 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
106803-99DrillTexaco Inc.Jan 29, 1981Jan 29, 1981Feb 19, 198111,900

Completions

CompletedLeaseFieldOperatorStatusDepth
May 9, 1987Garnett Gas Unit G-6-93531Oak Hill (Cotton Valley)TGNR Gulf Coast LLCTemp Abandoned · shut in Aug 1, 201510,900

Formation tops

As filed on W-2/G-1. Subsea from 388 ft elevation.Download CSV →

FormationMD ftSubsea
Glen RoseUPPER GLEN ROSE4,700-4,312
Rodessa6,400-6,012
Pettit7,100-6,712
Travis Peak7,345-6,957
Cotton Valley9,060-8,672
Bozier Shale10,200-9,812

Perforations

Perforated and open-hole intervals.

FromToType
10,51210,634Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,31512.251,360 S
2.37510,400——
5.510,8988.751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 1987Jun 29, 1987—
00Jan 12, 1984May 14, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40131114, documented in the API reference.