WELL · 42-401-31647 · DISTRICT 6

Texas Utilities 'B' #1

N

Rusk County  · Vertical

Texas Utilities 'B' #1 (API 42-401-31647) is a permitted well in Rusk County filed by Xto Energy Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1983 and 2013, permitted to 7,565 ft.

Completion filings report 6 formation tops, including Mass. Anhy., Mass. Anhydr., Rodessa, James Lime.

Its 2 leases have reported 137K barrels of oil and 760K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsFaulconer Energy, LLCthrough Apr 2026
Latest permitXTO Energy Inc.Mar 4, 2013
7,565
total depth, ft
2
permits on file
Mar 4, 2013
last permit issued
—
completed
137K
cumulative oil, bbl
760K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Texas Utilities "A" O-6-10986Laneville, NE. (Pettit, Lo.)Faulconer Energy, LLC3125K639KJan 1993 – Jul 2026
Texas Utilities "B" O-6-14918Laneville, NE. (Pettit, Lo.)Faulconer Energy, LLC112K120KSep 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 8,415 · prior 12 10,815(-22%)

01K2K202420252026

Oil, barrels lease total

Last 12 months 704 · prior 12 982(-28%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → Sep 1996
  2. 2BRG Petroleum, Inc.Oct 1996 → Jun 1998
  3. 3Seagull Energy E&P Inc.Jul 1998 → Nov 2000
  4. 4Ocean Energy, Inc.Dec 2000 → Oct 2002
  5. 5Nadel & GussmanNov 2002 → Mar 2003
  6. 6Nadel and Gussman, L.L.C.Apr 2003 → Dec 2007
  7. 7XTO Energy Inc.Jan 2008 → Mar 2023
  8. 8Faulconer Energy, LLCApr 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
757269-99RecompletionXTO Energy Inc.Feb 21, 2013Mar 4, 2013—7,565
188548-99DrillTXO Production Corp.Mar 15, 1983Mar 15, 1983Mar 26, 19837,565

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-10986————
—— O-6-14918————

Formation tops

As filed on W-2/G-1. Subsea from 405 ft elevation.Download CSV →

FormationMD ftSubsea
Mass. Anhy.6,070-5,665
Mass. Anhydr.6,070-5,665
Rodessa6,325-5,920
James LimeJAMES6,765-6,360
Pettit7,012-6,607
Travis Peak7,430-7,025

Perforations

Perforated and open-hole intervals.

FromToType
7,0897,096Perforated
7,1087,120Perforated
7,2877,292Perforated
7,4327,440Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,20911490 S
2.3757,390——
4.57,5657.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 2, 2009May 20, 1987—
00Jun 19, 1987May 20, 1987—
00Jun 5, 1987——
00Dec 2, 1986Oct 15, 1986Yes
00Nov 7, 1986——
00Jan 12, 1984May 12, 1983Yes
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.