WELL · 42-401-31648 · DISTRICT 6

Frame - Sharp #5

Plugged

Rusk County · East Texas field  · Vertical

Frame - Sharp #5 (API 42-401-31648) is a plugged well in Rusk County, plugged May 28, 2003, last operated by East Tex Salt Water Disposal CO..

The RRC has issued one drilling permit, issued March 7, 1983, permitted to 3,750 ft.

Completion filings report 4 formation tops, including Top Nacotoch, Pecan Gap, Top Lwr Taylor Shale, Woodbine.

Operator of record

East Tex Salt Water Disposal Co.

Based in
Kilgore, TX
P-5 status
Active (A)
P-5 last filed
Jun 5, 2026
Permits on file
93
Phone
(903) 984-3063

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEast Tex Salt Water Disposal Co.
Production reportsnone
Latest permitEast Tex Salt Water Disposal Co.Mar 7, 1983
3,750
total depth, ft
1
permits on file
Mar 7, 1983
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 28, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Frame - Sharp O-7-8602East TexasEast Tex Salt Water Disposal Co.600Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
188584-99DrillEast Tex Salt Water Disposal Co.Mar 7, 1983Mar 7, 1983Mar 20, 19833,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-7-8602————

Formation tops

As filed on W-2/G-1. Subsea from 371 ft elevation.Download CSV →

FormationMD ftSubsea
Top Nacotoch2,305-1,934
Pecan GapTOP PECAN GAP2,709-2,338
Top LWR Taylor Shale3,022-2,651
WoodbineTOP WOODBINE SD.3,649-3,278

Perforations

Perforated and open-hole intervals.

FromToType
3,6413,750Perforated
—3,600Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,35314.75750 S
10.751,353—750 S
73,6419.875375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 2002Feb 1, 2002Yes
00May 13, 1999Feb 25, 1999—
00Jun 10, 1997Apr 30, 1997—
00Jan 12, 1984May 3, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.09K
bbl, last 12 reported months
8.15M
bbl, all reported
Apr 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000010434H-1 InjectionPlugged Jun 7, 200420,0001,0003,641–3,750

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,092 · prior 12 40(+2630%)

05001K20032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40131648, documented in the API reference.