WELL · 42-401-32122 · DISTRICT 6

Christian Alice Estate Gas Unit #3U

Y

Rusk County · Oak Hill (Cotton Valley) field · Producing  · Vertical

Christian Alice Estate Gas Unit #3U (API 42-401-32122) is a well in Rusk County operated by Tgnr East Texas LLC, completed June 29, 1987 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1986 and 2001, permitted to 11,125 ft.

It was permitted by Rme Petroleum Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Glen Rose, Rodessa, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by Rme Petroleum Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTGNR East Texas LLCthrough Apr 2026
Latest permitRme Petroleum CompanySep 26, 2001
11,125
total depth, ft
2
permits on file
Sep 26, 2001
last permit issued
Jun 29, 1987
completed
0
cumulative oil, bbl
656K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 29, 1987
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Christian, Alice Estate Gas Unit G-6-124786Oak Hill (Cotton Valley)TGNR East Texas LLC10656KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 2,768 · prior 12 3,143(-12%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Castle Production CompanyJan 1993 → Apr 1997
  2. 2Union Pacific Resources CompanyMay 1997 → Jan 2001
  3. 3Rme Petroleum CompanyFeb 2001 → Nov 2002
  4. 4Anadarko E&P Company LPDec 2002 → Dec 2012
  5. 5Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  6. 6Cci East Texas Upstream LLCDec 2016 → Jan 2021
  7. 7TGNR East Texas LLCFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
513923-99RecompletionRme Petroleum CompanySep 26, 2001Sep 26, 2001—11,125
322447-99DrillArco Oil & Gas Co.Oct 29, 1986Oct 29, 1986—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 29, 1987Christian Alice Estate Gas Unit G-6-124786Oak Hill (Cotton Valley)TGNR East Texas LLCProducing11,125

Formation tops

As filed on W-2/G-1. Subsea from 388 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose4,960-4,572
Rodessa6,600-6,212
PettitPETTIT LIME7,400-7,012
Travis PeakTRAVIS PEAK SAND7,700-7,312
Cotton ValleyCOTTON VALLEY SAND9,300-8,912
BossierBOSSIER SHALE10,950-10,562

Perforations

Perforated and open-hole intervals.

FromToType
10,66510,869Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,60012.25690 S
711,1258.51,236 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 24, 1987Jul 24, 1987Yes
00Aug 13, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40132122, documented in the API reference.