TEXAS · WELLS · RUSK COUNTY · HENDERSON SWD,CASTLE TX PROD LP LEASE · API 42-401-32195 · DISTRICT 06

Henderson SWD Castle TX Prod LP #1

WaterPlugged

Rusk County · Oak Hill (Cotton Valley) field  · Vertical

Henderson Swd Castle TX Prod LP #1 (API 42-401-32195) is a plugged well in Rusk County, plugged February 13, 2015, last operated by Anadarko E&P Onshore LLC.

The RRC has issued one drilling permit, issued January 6, 1988, permitted to 8,000 ft.

It was permitted by Arco Oil & Gas CO. and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Glen Rose, Rodessa, Pettit.

Operator of record

Anadarko E&P Onshore LLC

Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,576
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsnone
Latest permitArco Oil & Gas Co.Jan 6, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
1
permits on file
Jan 6, 1988
last permit issued
Aug 31, 1988
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 31, 1988
Shut in
—
Plugged
Feb 13, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henderson Swd,castle TX Prod LP G-6-129670Oak Hill (Cotton Valley)Anadarko E&P Onshore LLC100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
341098-99DrillArco Oil & Gas Co.Jan 6, 1988Jan 6, 1988May 2, 19888,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 31, 1988Henderson SWD Castle TX Prod LP G-6-129670Oak Hill (Cotton Valley)Anadarko E&P Onshore LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 408 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose4,780-4,372
Rodessa6,450-6,042
PettitPETTIT LIME7,140-6,732

Perforations

Perforated and open-hole intervals.

FromToType
6,5466,580Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,22012.25555 S
77,6508.51,580 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 17, 1989Jan 9, 1989—
00Feb 9, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
4.36M
bbl, all reported
Nov 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000068544H-1 InjectionPlugged Mar 4, 20153,0001,5006,168–6,580

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40132195, documented in the API reference.