TEXAS · WELLS · RUSK COUNTY · MAJOR KENNEDY ESTATE LEASE · API 42-401-33029 · DISTRICT 06

Major Kennedy Estate #10

Y

Rusk County · Oak Hill (Cotton Valley) field · Producing  · Vertical

Major Kennedy Estate #10 (API 42-401-33029) is a well in Rusk County operated by Tgnr East Texas LLC, completed January 20, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 2, 2000, permitted to 10,575 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including BMA, Rodessa, James Lime, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Apr 2026
Latest permitUnion Pacific Resources CompanyOct 2, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,575
total depth, ft
1
permits on file
Oct 2, 2000
last permit issued
Jan 20, 2001
completed
0
cumulative oil, bbl
1.48M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 20, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Major Kennedy Estate G-6-182985Oak Hill, S.(cotton Valley)TGNR East Texas LLC101.48MJan 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 18,925 · prior 12 19,091(-1%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rme Petroleum CompanyJan 2001 → Nov 2002
  2. 2Anadarko E&P Company LPDec 2002 → Dec 2012
  3. 3Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  4. 4Cci East Texas Upstream LLCDec 2016 → Jan 2021
  5. 5TGNR East Texas LLCFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
498961-99DrillUnion Pacific Resources CompanyAug 28, 2000Oct 2, 2000Nov 28, 200012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 20, 2001Major Kennedy Estate G-6-182985Oak Hill (Cotton Valley)TGNR East Texas LLCProducing10,575

Formation tops

As filed on W-2/G-1. Subsea from 302 ft elevation.Download CSV →

FormationMD ftSubsea
BMA5,705-5,403
Rodessa6,105-5,803
James LimeJAMES6,435-6,133
Travis Peak6,965-6,663
Cotton Valley8,720-8,418
Bossier10,430-10,128

Perforations

Perforated and open-hole intervals.

FromToType
8,98710,410Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1640——
9.6251,03012.25380 S
5.510,5757.8751,120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 10, 2001May 16, 2001Yes
00Jul 5, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40133029, documented in the API reference.