TEXAS · WELLS · RUSK COUNTY · SMITH LEASE · API 42-401-33602 · DISTRICT 06

Smith #1

Shut in

Rusk County · Naconiche Creek (Rod.-TP Cons.) field · Producing  · Vertical

Smith #1 (API 42-401-33602) is a well in Rusk County operated by Barrow-Shaver Resources CO., completed December 1, 2005 and listed as producing on the RRC schedule, shut in July 1, 2026.

The RRC has issued one drilling permit (amended twice), issued June 29, 2005, permitted to 9,007 ft.

It was permitted by Gmt Exploration CO Texas, LLC and has since transferred to Barrow-Shaver Resources CO. on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Paluxy, BMA, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Barrow-Shaver Resources Co.

Permitted by GMT Exploration Co Texas, LLC; the EWA schedule now lists a different operator.

Based in
Tyler, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 2, 2026
Permits on file
201
Phone
(903) 593-5221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBarrow-Shaver Resources Co.
Production reportsBarrow-Shaver Resources Co.through Feb 2026
Latest permitGMT Exploration Co Texas, LLCJun 29, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,007
total depth, ft
3
permits on file
Jun 29, 2005
last permit issued
Dec 1, 2005
completed
0
cumulative oil, bbl
801K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2005
Shut in
Jul 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith G-6-217339Naconiche Creek (Rod.-TP Cons.)Barrow-Shaver Resources Co.10801KDec 2005 – Jul 2026

Gas, mcf lease total

Last 12 months 4,932 · prior 12 6,945(-29%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1GMT Exploration Co Texas, LLCJan 2006 → Jun 2014
  2. 2Barrow-Shaver Resources Co.Jul 2014 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
602733-97DrillGMT Exploration Co Texas, LLCDec 13, 2005Jun 29, 2005Aug 24, 20059,600
602733-98DrillGMT Exploration Co Texas, LLCJul 19, 2005Jun 29, 2005Aug 24, 20059,600
602733-99DrillGMT Exploration Co Texas, LLCJun 28, 2005Jun 29, 2005—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 1, 2005Smith G-6-217339Naconiche Creek (Rod.-TP Cons.)Barrow-Shaver Resources Co.Producing · shut in Jul 1, 20269,007

Formation tops

As filed on W-2/G-1. Subsea from 395 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkAUSTIN3,306-2,911
Paluxy4,194-3,799
BMA6,180-5,785
James LimeJAMES6,673-6,278
Sligo6,922-6,527
Travis Peak7,356-6,961

Perforations

Perforated and open-hole intervals.

FromToType
7,5747,635Perforated
7,7087,820Perforated
7,9048,047Perforated
8,1448,304Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,53212.25700 S
4.59,0077.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 4, 2006Jan 20, 2006Yes
00Jul 26, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40133602, documented in the API reference.