TEXAS · WELLS · RUSK COUNTY · ADAMS LEASE · API 42-401-33655 · DISTRICT 06

Adams #1

Shut in

Rusk County · Naconiche Creek (Rod.-TP Cons.) field · Producing  · Vertical

Adams #1 (API 42-401-33655) is a well in Rusk County operated by Barrow-Shaver Resources CO., completed February 15, 2006 and listed as producing on the RRC schedule, shut in July 1, 2026.

The RRC has issued one drilling permit (amended once), issued August 22, 2005, permitted to 9,206 ft.

It was permitted by Gmt Exploration CO Texas, LLC and has since transferred to Barrow-Shaver Resources CO. on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Paluxy, BMA, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Barrow-Shaver Resources Co.

Permitted by GMT Exploration Co Texas, LLC; the EWA schedule now lists a different operator.

Based in
Tyler, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 2, 2026
Permits on file
201
Phone
(903) 593-5221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBarrow-Shaver Resources Co.
Production reportsBarrow-Shaver Resources Co.through Apr 2026
Latest permitGMT Exploration Co Texas, LLCAug 22, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,206
total depth, ft
2
permits on file
Aug 22, 2005
last permit issued
Feb 15, 2006
completed
0
cumulative oil, bbl
894K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 15, 2006
Shut in
Jul 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Adams G-6-218770Naconiche Creek (Rod.-TP Cons.)Barrow-Shaver Resources Co.10894KJan 2006 – Jul 2026

Gas, mcf lease total

Last 12 months 652 · prior 12 1,595(-59%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1GMT Exploration Co Texas, LLCJan 2006 → Jun 2014
  2. 2Barrow-Shaver Resources Co.Jul 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
605238-98DrillGMT Exploration Co Texas, LLCDec 27, 2005Aug 22, 2005Dec 14, 20059,600
605238-99DrillGMT Exploration Co Texas, LLCAug 19, 2005Aug 22, 2005Dec 14, 20059,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 15, 2006Adams G-6-218770Naconiche Creek (Rod.-TP Cons.)Barrow-Shaver Resources Co.Producing · shut in Jul 1, 20269,206

Formation tops

As filed on W-2/G-1. Subsea from 340 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkAUSTIN3,097-2,757
Paluxy3,978-3,638
BMA5,995-5,655
James LimeJAMES6,484-6,144
Sligo6,733-6,393
Travis Peak7,168-6,828

Perforations

Perforated and open-hole intervals.

FromToType
7,3859,137Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.59,2067.875815 S
8.62515,21012.25700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 6, 2007Mar 10, 2006Yes
00Sep 8, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40133655, documented in the API reference.