WELL · 42-401-34595 · DISTRICT 6
Morris PR #1
Rusk County · Laneville NE. (Pettit Lo.) field · Vertical
Morris PR #1 (API 42-401-34595) is a plugged well in Rusk County, plugged May 19, 2013, last operated by Cabot Oil & Gas Corporation.
The RRC has issued one drilling permit, issued December 7, 2007, permitted to 7,430 ft.
It was permitted by Enduring Resources, LLC and has since transferred to Cabot Oil & Gas Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including Base Massive Hydrate, James Lime, Pettit.
Its lease has reported 3.22K barrels of oil and 1.54K mcf of gas since February 2008, last reporting in September 2013.
Operator of record
Permitted by Enduring Resources, LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 1, 2021
- Permits on file
- 1,040
- Phone
- (817) 589-4600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cabot Oil & Gas Corporation |
| Production reports | Cabot Oil & Gas Corporationthrough Jul 2012 |
| Latest permit | Enduring Resources, LLCDec 7, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,430
- total depth, ft
- 1
- permits on file
- Dec 7, 2007
- last permit issued
- Apr 16, 2008
- completed
- 3.22K
- cumulative oil, bbl
- 1.54K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2008 THROUGH Sep 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 16, 2008
- Shut in
- —
- Plugged
- May 19, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Morris PR O-6-14884 | Laneville, NE. (Pettit, Lo.) | Cabot Oil & Gas Corporation | 1 | 3.22K | 1.54K | Feb 2008 – Sep 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enduring Resources, LLCFeb 2008 → Jul 2008
- 2Cabot Oil & Gas CorporationAug 2008 → Jul 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 649870-99 | Drill | Enduring Resources, LLC | Nov 16, 2007 | Dec 7, 2007 | Dec 13, 2007 | 7,430 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-14884 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 378 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Massive Hydrate | 6,341 | -5,963 |
| James Lime | 6,812 | -6,434 |
| Pettit | 7,058 | -6,680 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,143 | 7,167 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,308 | 11 | 430 S |
| 4.5 | 7,325 | 7.875 | 305 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 22, 2009 | Jun 9, 2008 | Yes |
| 00 | Jun 11, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-34595 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-34595 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40134595, documented in the API reference.