TEXAS · WELLS · SAN AUGUSTINE COUNTY · VON GOETZ, KATHERINE LEASE · API 42-405-30203 · DISTRICT 06

Von Goetz Katherine #2H

Shut in

San Augustine County · Angie (James Lime) field · Temp Abandoned  · Horizontal

Von Goetz Katherine #2H (API 42-405-30203) is a horizontal well in San Augustine County operated by Adamas Energy LLC, completed December 4, 2008 and listed as temp abandoned on the RRC schedule, shut in April 1, 2023.

The RRC has issued one drilling permit (amended twice), issued August 10, 2007, permitted to 7,771 ft.

It was permitted by Cabot Oil & Gas Corporation and has since transferred to Adamas Energy LLC on the wellbore schedule.

Completion filings report one formation top, including James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Adamas Energy LLC

Permitted by Cabot Oil & Gas Corporation; the EWA schedule now lists a different operator.

Based in
Dover, DE
P-5 status
Active (A)
P-5 last filed
Jan 6, 2026
Permits on file
67
Phone
(214) 750-4388

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAdamas Energy LLC
Production reportsAethon Energy Operating LLCthrough Mar 2023
Latest permitCabot Oil & Gas CorporationAug 10, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,771
total depth, ft
3
permits on file
Aug 10, 2007
last permit issued
Dec 4, 2008
completed
0
cumulative oil, bbl
984K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 4, 2008
Shut in
Apr 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Von Goetz, Katherine G-6-247217Angie (James Lime)Adamas Energy LLC10984KDec 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cabot Oil & Gas CorporationDec 2008 → Jun 2018
  2. 2Aethon Energy Operating LLCJul 2018 → Mar 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
643888-97DrillCabot Oil & Gas CorporationMar 10, 2009Aug 10, 2007Oct 18, 20089,000
643888-98DrillCabot Oil & Gas CorporationMay 21, 2008Aug 10, 2007Oct 18, 20089,000
643888-99DrillCabot Oil & Gas CorporationAug 6, 2007Aug 10, 2007—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 4, 2008Von Goetz Katherine G-6-247217Angie (James Lime)Adamas Energy LLCTemp Abandoned · shut in Apr 1, 20237,771

Formation tops

As filed on W-2/G-1. Subsea from 411 ft elevation.Download CSV →

FormationMD ftSubsea
James Lime7,793-7,382

Perforations

Perforated and open-hole intervals.

FromToType
8,14512,199Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,83512.25894 S
78,0188.75181 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 2, 2009Jan 20, 2009—
00Jun 12, 2009Jan 15, 2009Yes
00May 22, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40530203, documented in the API reference.