TEXAS · WELLS · SAN AUGUSTINE COUNTY · WYNN, LELIA UNIT LEASE · API 42-405-30277 · DISTRICT 06

Wynn Lelia Unit #2H

Y

San Augustine County · Angie (James Lime) field · Temp Abandoned  · Horizontal

Wynn Lelia Unit #2H (API 42-405-30277) is a horizontal well in San Augustine County operated by Adamas Energy LLC, completed March 22, 2010 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued June 10, 2009, permitted to 7,625 ft.

It was permitted by Cabot Oil & Gas Corporation and has since transferred to Adamas Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Glen Rose, Bexar, James Lime.

Its lease has reported 295 barrels of oil and 1.46M mcf of gas since June 2009, last reporting volume in April 2026.

Operator of record

Adamas Energy LLC

Permitted by Cabot Oil & Gas Corporation; the EWA schedule now lists a different operator.

Based in
Dover, DE
P-5 status
Active (A)
P-5 last filed
Jan 6, 2026
Permits on file
67
Phone
(214) 750-4388

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAdamas Energy LLC
Production reportsAdamas Energy LLCthrough Apr 2026
Latest permitCabot Oil & Gas CorporationJun 10, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,625
total depth, ft
1
permits on file
Jun 10, 2009
last permit issued
Mar 22, 2010
completed
295
cumulative oil, bbl
1.46M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 22, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wynn, Lelia Unit G-6-251769Angie (James Lime)Adamas Energy LLC12951.46MJun 2009 – Apr 2026

Gas, mcf lease total

Last 12 months 15,588 · prior 12 26,375(-41%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cabot Oil & Gas CorporationMar 2010 → Jun 2018
  2. 2Aethon Energy Operating LLCJul 2018 → Feb 2026
  3. 3Adamas Energy LLCMar 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
681265-99DrillCabot Oil & Gas CorporationMay 14, 2009Jun 10, 2009Jun 13, 20099,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 22, 2010Wynn Lelia Unit G-6-251769Angie (James Lime)Adamas Energy LLCTemp Abandoned7,625

Formation tops

As filed on W-2/G-1. Subsea from 329 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose5,330-5,001
Bexar7,220-6,891
James Lime7,500-7,171
James LimeTOP OF JAMES LIME7,500-7,171

Perforations

Perforated and open-hole intervals.

FromToType
7,90213,301Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,84012.25—
77,6508.75147 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 26, 2010Apr 19, 2010—
00Feb 17, 2010Sep 10, 2009Yes
00Oct 16, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40530277, documented in the API reference.