TEXAS · WELLS · SAN AUGUSTINE COUNTY · BLACK STONE UNIT A-43 LEASE · API 42-405-30369 · DISTRICT 06
Black Stone Unit A-43 #2H
San Augustine County · Carthage (Haynesville Shale) field · Producing · Horizontal
Black Stone Unit A-43 #2H (API 42-405-30369) is a horizontal well in San Augustine County operated by Xto Energy Inc., completed January 6, 2011 and listed as producing on the RRC schedule, shut in July 1, 2025.
The RRC has issued one drilling permit (amended once), issued August 11, 2010, permitted to 14,015 ft.
It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Bossier, Knowles.
Its lease has reported 15 barrels of oil and 1.8M mcf of gas since January 2011, last reporting volume in June 2025.
Operator of record
Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Jun 2025 |
| Latest permit | Encana Oil & Gas(usa) Inc.Aug 11, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,015
- total depth, ft
- 2
- permits on file
- Aug 11, 2010
- last permit issued
- Jan 6, 2011
- completed
- 15
- cumulative oil, bbl
- 1.8M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · JAN 2011 THROUGH JUN 2025
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 6, 2011
- Shut in
- Jul 1, 2025
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Black Stone Unit A-43 G-6-262300 | Carthage (Haynesville Shale) | XTO Energy Inc. | 1 | 15 | 1.8M | Jan 2011 – Jun 2025 |
Gas, mcf lease total
Last 12 months 53 · prior 12 5,247(-99%)
Wells named Black Stone Unit A-43
XTO Energy Inc.'s other wells filed under this lease name in San Augustine County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Encana Oil & Gas(usa) Inc.Jan 2011 → Mar 2014
- 2XTO Energy Inc.Apr 2014 → Jun 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 700431-98 | Drill | Encana Oil & Gas(usa) Inc. | Nov 1, 2011 | Aug 11, 2010 | Sep 20, 2010 | 14,800 |
| 700431-99 | Drill | Encana Oil & Gas(usa) Inc. | Aug 9, 2010 | Aug 11, 2010 | Sep 20, 2010 | 14,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 6, 2011 | Black Stone Unit A-43 G-6-262300 | Carthage (Haynesville Shale) | XTO Energy Inc. | Producing · shut in Jul 1, 2025 | 14,015 |
Formation tops
As filed on W-2/G-1. Subsea from 330 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 14,271 | 14,482 | Perforated |
| 14,552 | 14,871 | Perforated |
| 14,944 | 15,219 | Perforated |
| 15,279 | 15,505 | Perforated |
| 15,560 | 15,889 | Perforated |
| 15,952 | 16,230 | Perforated |
| 16,287 | 16,504 | Perforated |
| 16,568 | 16,849 | Perforated |
| 16,910 | 17,179 | Perforated |
| 17,234 | 17,512 | Perforated |
| 17,575 | 17,801 | Perforated |
| 17,864 | 18,137 | Perforated |
| 18,190 | 18,357 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,018 | 16 | 1,240 S |
| 7.625 | 13,470 | 9.875 | 1,735 S |
| 5 | 18,543 | 6.75 | 795 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 27, 2012 | Mar 15, 2011 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received Dec 18, 2013. Cased hole. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| SURVEYS CASED HOLE | TIFF | 9,000 to 18,500 | Dec 18, 2013run Sep 28, 2010 | 6.52 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-405-30369 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-405-30369 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40530369, documented in the API reference.