TEXAS · WELLS · SAN AUGUSTINE COUNTY · TAZ GAS UNIT LEASE · API 42-405-30618 · DISTRICT 06

Taz Gas Unit #5HB

Y

San Augustine County · Carthage (Haynesville Shale) field · Producing  · Horizontal

Taz Gas Unit #5HB (API 42-405-30618) is a horizontal well in San Augustine County operated by Bpx Operating Company, completed March 23, 2018 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 6, 2017, permitted to 13,866 ft.

It was permitted by BP America Production Company and has since transferred to Bpx Operating Company on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, James Lime, Haynesville.

No lease production has been reported under this well’s leases.

Operator of record

BPX Operating Company

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
1,576
Phone
(720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBPX Operating Company
Production reportsBPX Operating Companythrough Apr 2026
Latest permitBP America Production CompanyJan 6, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,866
total depth, ft
1
permits on file
Jan 6, 2017
last permit issued
Mar 23, 2018
completed
0
cumulative oil, bbl
11.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2018 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 23, 2018
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Taz Gas Unit G-6-284070Carthage (Haynesville Shale)BPX Operating Company1011.1MFeb 2018 – Jul 2026

Gas, mcf lease total

Last 12 months 281,897 · prior 12 349,576(-19%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BP America Production CompanyMar 2018 → Feb 2022
  2. 2BPX Operating CompanyMar 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
821620-99DrillBP America Production CompanyDec 27, 2016Jan 6, 2017Feb 5, 201719,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 23, 2018Taz Gas Unit G-6-284070Carthage (Haynesville Shale)BPX Operating CompanyProducing13,866

Formation tops

As filed on W-2/G-1. Subsea from 330 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk5,001-4,671
Austin Chalk5,003-4,673
James Lime8,236-7,906
James Lime8,261-7,931
Haynesville12,844-12,514
Haynesville12,856-12,526

Perforations

Perforated and open-hole intervals.

FromToType
13,99921,521Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,41017.51,873 S
9.62512,98712.251,769 S
5.521,8208.52,695 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 6, 2018Jun 7, 2018Yes
00Jun 8, 2018Feb 14, 2018Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40530618, documented in the API reference.