TEXAS · WELLS · SAN AUGUSTINE COUNTY · BSI/USFS F6 DU LEASE · API 42-405-30624 · DISTRICT 06

Bsi/Usfs F6 Du #H 4

Shut in

San Augustine County · Carthage (Haynesville Shale) field · Producing  · Horizontal

Bsi/Usfs F6 Du #H 4 (API 42-405-30624) is a horizontal well in San Augustine County operated by Xto Energy Inc., completed June 16, 2018 and listed as producing on the RRC schedule, shut in June 1, 2024.

The RRC has issued one drilling permit, issued March 28, 2017, permitted to 14,183 ft.

Completion filings report 3 formation tops, including Austin Chalk, James Lime, Haynesville.

No lease production has been reported under this well’s leases.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through May 2024
Latest permitXTO Energy Inc.Mar 28, 2017
14,183
total depth, ft
1
permits on file
Mar 28, 2017
last permit issued
Jun 16, 2018
completed
0
cumulative oil, bbl
12.4M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 16, 2018
Shut in
Jun 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bsi/Usfs F6 Du G-6-282612Carthage (Haynesville Shale)XTO Energy Inc.1012.4MMay 2017 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 79(-100%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jun 2018 → May 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
824429-99DrillXTO Energy Inc.Mar 14, 2017Mar 28, 2017Apr 16, 201720,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 16, 2018Bsi/Usfs F6 Du G-6-282612Carthage (Haynesville Shale)XTO Energy Inc.Producing · shut in Jun 1, 202414,183

Formation tops

As filed on W-2/G-1. Subsea from 299 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk4,897-4,598
James Lime8,164-7,865
Haynesville13,940-13,641

Perforations

Perforated and open-hole intervals.

FromToType
14,60022,593Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,96513.51,450 S
7.2513,0759.8752,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 27, 2018Aug 16, 2018Yes
00Oct 12, 2017Jun 22, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40530624, documented in the API reference.