TEXAS · WELLS · SAN JACINTO COUNTY · LANGHAM, EMILY "A" LEASE · API 42-407-30667 · DISTRICT 03

Langham Emily A #13

Shut in

San Jacinto County · Urbana (Wilcox Consolidated) field · Temp Abandoned  · Vertical

Langham Emily A #13 (API 42-407-30667) is a well in San Jacinto County operated by Orx Resources L.L.C., completed July 13, 2012 and listed as temp abandoned on the RRC schedule, shut in May 1, 2023.

The RRC has issued one drilling permit, issued December 17, 2007, permitted to 11,640 ft.

It was permitted by Alta Mesa Services, LP and has since transferred to Orx Resources L.L.C. on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Orx Resources L.L.C.

Permitted by Alta Mesa Services, LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Sep 2, 2025
Permits on file
1
Phone
(346) 444-3320

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOrx Resources L.L.C.
Production reportsOrx Resources, L.L.C.through Feb 2026
Latest permitAlta Mesa Services, LPDec 17, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,640
total depth, ft
1
permits on file
Dec 17, 2007
last permit issued
Jul 13, 2012
completed
0
cumulative oil, bbl
580K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 13, 2012
Shut in
May 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Langham, Emily "A" G-3-235543Urbana (Wilcox Consolidated)Orx Resources, L.L.C.10580KMar 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 60 · prior 12 0

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Alta Mesa Services, LPMar 2008 → Jul 2018
  2. 2Five-Jab, Inc.Aug 2018 → Jan 2020
  3. 3Petrodome Operating, LLCFeb 2020 → Feb 2022
  4. 4Orx Resources, L.L.C.Mar 2022 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
651244-99DrillAlta Mesa Services, LPDec 12, 2007Dec 17, 2007Jan 27, 200811,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 13, 2012Langham Emily A G-3-235543Urbana (Wilcox Consolidated)Orx Resources L.L.C.Temp Abandoned · shut in May 1, 202311,640

Formation tops

As filed on W-2/G-1. Subsea from 159 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox7,240-7,081
WilcoxWILCOX (CONSOLIDATED FIELD)——
WilcoxWILCOX CONSOLIDATED FIELD——

Perforations

Perforated and open-hole intervals.

FromToType
11,10411,110Perforated
11,30311,314Perforated
11,34411,374Perforated
11,50011,507Perforated
11,56211,568Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,21512.25660 S
5.511,6408.75900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 28, 2014Sep 4, 2012—
00Dec 15, 2008Nov 12, 2008—
00Jun 11, 2008May 15, 2008Yes
00Jun 2, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40730667, documented in the API reference.