TEXAS · WELLS · SAN PATRICIO COUNTY · WELDER, R. H. LEASE · API 42-409-01740 · DISTRICT 04

Welder R. H. #25

Plugged

San Patricio County · Portilla (7050 Sand) field  · Vertical

Welder R. H. #25 (API 42-409-01740) is a plugged well in San Patricio County, plugged May 26, 2005, last operated by Smith Production Inc..

The RRC has issued 2 drilling permits between 1980 and 1985, permitted to 7,157 ft.

It was permitted by Texaco Inc. and has since transferred to Smith Production Inc. on the wellbore schedule.

Operator of record

Smith Production Inc.

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Active (A)
P-5 last filed
Nov 12, 2025
Permits on file
433
Phone
(281) 296-5600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Production Inc.
Production reportsnone
Latest permitTexaco Inc.Jan 18, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,157
total depth, ft
2
permits on file
Jan 18, 1985
last permit issued
Mar 5, 1985
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 5, 1985
Shut in
—
Plugged
May 26, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder, R. H. G-4-91469Portilla (7050 Sand)Smith Production Inc.100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
264619-99RecompletionTexaco Inc.Jan 16, 1985Jan 18, 1985—7,157
97830-99RecompletionTexaco Inc.Oct 31, 1980Oct 31, 1980—7,157

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 5, 1985Welder R. H. G-4-91469Portilla (7050 Sand)Smith Production Inc.Plugged—
Mar 5, 1985Welder R. H. G-4-91469Portilla (7050 Sand)Smith Production Inc.Plugged—
—Welder R. H. O-4-2174Portilla (7100 Sand)Smith Production Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,2495,255Perforated
7,0867,090Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,199——
10.751,21515800 S
10.751,215——
2.3757,116——
2.3757,130——
5.57,157—500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 22, 1985Mar 19, 1985—
00Jan 12, 1984Dec 22, 1980—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40901740, documented in the API reference.