TEXAS · WELLS · SAN PATRICIO COUNTY · API 42-409-03081 · DISTRICT 04
Baldwin #11
San Patricio County · White Point East (3000) field · Vertical
Baldwin #11 (API 42-409-03081) is a plugged well in San Patricio County, plugged June 3, 2013, last operated by Dorado Oil Company.
The RRC has issued one drilling permit, issued March 22, 1993, permitted to 3,000 ft.
It was permitted by Olsen Energy Inc. and has since transferred to Dorado Oil Company on the wellbore schedule.
Completion filings report one formation top, including White Point E..
Operator of record
Permitted by Olsen Energy Inc.; the EWA schedule now lists a different operator.
- Based in
- Corpus Chrsti, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 28, 2026
- Permits on file
- 2
- Phone
- (361) 241-3200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Olsen Energy Inc. |
| Production reports | Dorado Oil Companythrough Mar 2011 |
| Latest permit | Olsen Energy Inc.Mar 22, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,000
- total depth, ft
- 1
- permits on file
- Mar 22, 1993
- last permit issued
- Mar 24, 1993
- completed
- 0
- cumulative oil, bbl
- 104K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 24, 1993
- Shut in
- —
- Plugged
- Jun 3, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baldwin G-4-144654 | White Point, East (3000) | Dorado Oil Company | 1 | 0 | 104K | Mar 1993 – Jun 2013 |
| Baldwin G-4-31059 | White Point, East (3800) | Olsen Energy Inc. | 1 | 0 | 0 | Jan 1993 – Mar 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Olsen Energy Inc.Mar 1993 → Feb 1994
- 2Dorado Oil CompanyMar 1994 → Mar 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409854-99 | Recompletion | Olsen Energy Inc. | Mar 15, 1993 | Mar 22, 1993 | Mar 23, 1993 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 24, 1993 | Baldwin G-4-144654 | White Point East (3000) | Dorado Oil Company | Plugged | — |
| Aug 20, 1963 | Baldwin G-4-31059 | White Point East (3800) | Olsen Energy Inc. | Plugged | — |
| — | Baldwin O-4-3277 | White Point East | Dorado Oil Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 59 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| White Point E. | 3,800 | -3,741 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,960 | 2,970 | Perforated |
| — | 4,930 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,163 | 15 | 750 S |
| 10.75 | 1,163 | — | — |
| 5.5 | 5,680 | 9.125 | 1,000 S |
| 5.5 | 5,680 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 29, 1993 | Apr 2, 1993 | Yes |
| 00 | Apr 7, 1993 | — | — |
| 00 | Jan 12, 1984 | Oct 18, 1963 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-03081 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-03081 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40903081, documented in the API reference.