TEXAS · WELLS · SAN PATRICIO COUNTY · API 42-409-03094 · DISTRICT 04
Ficke F.H. Gas Unit 21-2 #1
San Patricio County · White Point East (2100) field · Vertical
Ficke F.H. Gas Unit 21-2 #1 (API 42-409-03094) is a well in San Patricio County operated by Marathon Oil Company, completed July 31, 1981.
The RRC has issued one drilling permit, issued July 24, 1981, permitted to 5,649 ft.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active (A)RRC P-5 file of Nov 18, 2026
- P-5 last filed
- Oct 6, 2026
- Permits on file
- 3,707
- Phone
- (281) 293-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Marathon Oil Company |
| Production reports | none |
| Latest permit | Marathon Oil CompanyJul 24, 1981 |
- 5,649
- total depth, ft
- 1
- permits on file
- Jul 24, 1981
- last permit issued
- Jul 31, 1981
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 31, 1981
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Wells named Ficke F.H. Gas Unit 21-2
Marathon Oil Company's other wells filed under this lease name in San Patricio County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Operator on the lease's P-4
Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.
| Operator | From | To |
|---|---|---|
| Marathon Oil Company | Aug 1, 1981 | today |
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 127065-99 | Recompletion | Marathon Oil Company | Jul 24, 1981 | Jul 24, 1981 | — | 5,649 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 31, 1981 | Ficke F.H. Gas Unit 21-2 G-4-95139 | White Point East (2100) | Marathon Oil Company | Not on Schedule | — |
| — | Ficke F. H. G-4-52162 | White Point East (2150) | Marathon Oil Company | Not on Schedule | — |
| — | Ficke O-4-3307 | White Point East | EOG Resources Inc. | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,110 | 4,934 | Perforated |
| — | 5,610 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13 | 1,339 | 18 | 500 S |
| 13 | 1,339 | — | 500 S |
| 2.375 | 1,996 | — | — |
| 7.625 | 5,649 | 11 | 800 S |
| 7.625 | 5,649 | — | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 19, 1981 | — |
| 00 | Jan 12, 1984 | Mar 21, 1972 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-03094 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-03094 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40903094, documented in the API reference.