TEXAS · WELLS · SAN PATRICIO COUNTY · TEETER, J.A. LEASE · API 42-409-03122 · DISTRICT 04

Teeter J.A. #4

Plugged

San Patricio County · White Point E. (White PT.2500) field  · Vertical

Teeter J.A. #4 (API 42-409-03122) is a plugged well in San Patricio County, plugged October 25, 2011, last operated by Eog Resources Inc..

The RRC has issued 2 drilling permits between 1977 and 1984, permitted to 5,676 ft.

It was permitted by Marathon Oil Company and has since transferred to Eog Resources Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Anahuac, Frio.

Operator of record

EOG Resources Inc.

Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,354
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsnone
Latest permitMarathon Oil CompanyFeb 14, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,676
total depth, ft
2
permits on file
Feb 14, 1984
last permit issued
Oct 10, 1996
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 10, 1996
Shut in
—
Plugged
Oct 25, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Teeter, J.A. G-4-109606White Point, E. (White PT.2500)EOG Resources, Inc.100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
229372-99RecompletionMarathon Oil CompanyFeb 6, 1984Feb 14, 1984—5,676
8479-99RecompletionMarathon Oil CompanySep 6, 1977Sep 6, 1977—5,676

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 10, 1996Teeter J.A. G-4-109606White Point E. (White PT.2500)EOG Resources Inc.Plugged—
—Teeter O-4-4469White Point East (5000 Sd.)Marathon Oil CompanyPlugged—
—Teeter O-4-4469White Point East (5000 Sd.)Marathon Oil CompanyPlugged—
—Teeter J. A. O-4-8612White Point East. (4280)Marathon Oil CompanyPlugged—
—Teeter O-4-3329White Point EastMarathon Oil CompanyPlugged—
—Teeter O-4-3329White Point EastMarathon Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 63 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE162
Anahuac1,800-1,737
FrioFRIO (UPPER)3,300-3,237

Perforations

Perforated and open-hole intervals.

FromToType
2,1542,159Perforated
2,2742,279Perforated
2,5112,514Perforated
—4,284Perforated
—4,996Perforated
—5,560Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,32515650 S
10.751,33915650 S
5.55,6768.75250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 25, 1996Nov 7, 1996—
00Apr 18, 1984Mar 23, 1984—
00Mar 30, 1984Mar 23, 1984—
00Jan 12, 1984Dec 16, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40903122, documented in the API reference.