WELL · 42-409-30176 · DISTRICT 4

Welder R. H. -a- a/C 1 #35

Plugged

San Patricio County · Sinton North (5600) field  · Vertical

Welder R. H. -A- A/C 1 #35 (API 42-409-30176) is a plugged well in San Patricio County, plugged December 13, 2017, last operated by Marathon Oil Company.

The RRC has issued 3 drilling permits between 1978 and 1994, permitted to 8,200 ft.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Anahuac, Frio.

Its 3 leases have reported 130K barrels of oil and 188K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Marathon Oil Company

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 14, 2025
Permits on file
3,707
Phone
(281) 293-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil Company
Production reportsHazelett Oil, Inc.through Jul 2006
Latest permitMarathon Oil CompanyMay 13, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,200
total depth, ft
3
permits on file
May 13, 1994
last permit issued
—
completed
130K
cumulative oil, bbl
188K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 13, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder, R. H. -a- a/C 1 O-4-7311Sinton, North (4600)Dallas Petroleum Group, LLC2130K131KJan 1993 – Jul 2026
Welder, R.H. "A" G-4-146105Sinton, North (5150)Marathon Oil Company1057.6KJun 1993 – Apr 1994
Welder,rh "A" G-4-82225Sinton, NorthMarathon Oil Company100Jan 1993 – Jun 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJul 1993 → Dec 1999
  2. 2Consolidated Petro Ptnrs I, LLCJan 2000 → Nov 2001
  3. 3Kebo Oil & Gas, Inc.Dec 2001 → Jun 2002
  4. 4Hazelett Oil Company, Inc.Jul 2002 → Sep 2005
  5. 5Hazelett Oil, Inc.Oct 2005 → Jul 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
423914-99RecompletionMarathon Oil CompanyMay 13, 1994May 13, 1994Apr 25, 19948,200
413451-99RecompletionMarathon Oil CompanyJul 2, 1993Jul 2, 1993Jun 28, 19938,200
40773-99RecompletionMarathon Oil CompanyDec 8, 1978Dec 8, 1978—8,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-82225————
—— G-4-146105————
—— O-4-7311————

Formation tops

As filed on W-2/G-1. Subsea from 58 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE157
Anahuac4,450-4,392
Frio5,150-5,092

Perforations

Perforated and open-hole intervals.

FromToType
4,6664,671Perforated
5,1465,150Perforated
5,3865,394Perforated
5,4005,402Perforated
5,4085,410Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,12915735 S
2.3755,335——
7.6257,5159.875760 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 1994May 9, 1994Yes
00Jun 13, 1994——
00Sep 17, 1993Jul 16, 1993Yes
00Aug 16, 1993——
00Dec 5, 1988Oct 20, 1988—
00Jun 24, 1987May 20, 1987—
00Jan 12, 1984May 16, 1979—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.