WELL · 42-409-30221 · DISTRICT 4

Welder J. F. Unit #C33 I

Plugged

San Patricio County · Odem field  · Vertical

Welder J. F. Unit #C33 I (API 42-409-30221) is a plugged well in San Patricio County, plugged April 30, 2003, last operated by 84 Energy LLC.

The RRC has issued one drilling permit, issued September 15, 1980, permitted to 5,750 ft.

It was permitted by Texaco Inc. and has since transferred to 84 Energy LLC on the wellbore schedule.

Its lease has reported 60.4K barrels of oil and 705K mcf of gas since January 1993, last reporting in July 2026. The lease carries 14 wells, so these are lease totals, not this well alone.

Operator of record

84 Energy LLC

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Sugar Land, TX
P-5 status
Active (A)
P-5 last filed
Mar 13, 2026
Permits on file
1
Phone
(832) 398-0917

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco E & P Inc.
Production reports84 Energy LLCthrough Aug 2025
Latest permitTexaco Inc.Sep 15, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,750
total depth, ft
1
permits on file
Sep 15, 1980
last permit issued
Jan 16, 1985
completed
60.4K
cumulative oil, bbl
705K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 16, 1985
Shut in
—
Plugged
Apr 30, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder, J. F., Unit O-4-1996Odem84 Energy LLC1460.4K705KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 142 · prior 12 747(-81%)

050100150202420252026

Gas, mcf lease total

Last 12 months 157 · prior 12 2,234(-93%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Smith Production Inc.Sep 1995 → Apr 1999
  2. 2Energen Resources CorporationMay 1999 → Aug 2003
  3. 3Aroc (Texas) Inc.Sep 2003 → Feb 2005
  4. 4Southern Bay Operating, L.L.C.Mar 2005 → Jun 2013
  5. 5HK Energy Operating, LLCJul 2013 → Oct 2013
  6. 6Wagner Oil CompanyNov 2013 → Jul 2020
  7. 7GTG Operating, LLCAug 2020 → Dec 2024
  8. 884 Energy LLCFeb 2025 → Aug 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
92616-99RecompletionTexaco Inc.Sep 15, 1980Sep 15, 1980—5,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 16, 1985Welder J. F. Unit O-4-1996Odem84 Energy LLCPlugged—
—Welder J. F. Unit O-4-7841Odem (5560)Texaco E & P Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
2,8502,870Perforated
2,9342,954Perforated
4,2004,526Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62552612.25350 S
2.3753,594——
4.55,7507.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 5, 1985Jan 21, 1985—
00Jan 12, 1984Nov 6, 1980—
00Jan 12, 1984Nov 19, 1971—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.67M
bbl, all reported
Jan 2003
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000004392W-14 DisposalPlugged May 19, 20032,0006501,300–4,530

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120022003

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40930221, documented in the API reference.