TEXAS · WELLS · SAN PATRICIO COUNTY · WELDER, E.H. -E- LEASE · API 42-409-31462 · DISTRICT 04
Welder E.H. -E- #27
San Patricio County · Rooke (6700) field · Shut In · Vertical
Welder E.H. -E- #27 (API 42-409-31462) is a well in San Patricio County operated by Mcgowan Working Partners Inc., completed May 12, 1989 and listed as shut in on the RRC schedule, shut in January 1, 1998.
The RRC has issued 3 drilling permits between 1980 and 1989, permitted to 7,210 ft.
It was permitted by Marathon Oil Company and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.
Completion filings report one formation top, including Frio.
Its lease has reported 3.18K barrels of oil and 6.65K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.
- Based in
- Jackson, MS
- P-5 status
- Active (A)
- P-5 last filed
- Oct 27, 2025
- Permits on file
- 60
- Phone
- (601) 982-3444
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | McGowan Working Partners Inc. |
| Production reports | McGowan Working Partners, Inc.through May 1994 |
| Latest permit | Marathon Oil CompanyMay 18, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,210
- total depth, ft
- 3
- permits on file
- May 18, 1989
- last permit issued
- May 12, 1989
- completed
- 3.18K
- cumulative oil, bbl
- 6.65K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH May 1994
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 12, 1989
- Shut in
- Jan 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Welder, E.H. -E- O-4-11679 | Rooke (6700) | McGowan Working Partners, Inc. | 1 | 3.18K | 6.65K | Jan 1993 – May 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil CompanyAug 1993 → May 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 359248-99 | Recompletion | Marathon Oil Company | May 12, 1989 | May 18, 1989 | — | 7,210 |
| 343044-99 | Recompletion | Marathon Oil Company | Feb 23, 1988 | Feb 24, 1988 | — | 7,210 |
| 96726-99 | Drill | Marathon Oil Company | Oct 24, 1980 | Oct 24, 1980 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 12, 1989 | Welder E.H. -E- O-4-11679 | Rooke (6700) | McGowan Working Partners Inc. | Shut In · shut in Jan 1, 1998 | 7,210 |
| May 12, 1989 | Welder E. H. -E- G-4-130781 | Rooke (6700) | Marathon Oil Company | Not on Schedule | — |
| Feb 26, 1988 | Welder E.H. G-4-126835 | Rooke N. (6830) | Marathon Oil Company | Not on Schedule | — |
| Jan 22, 1981 | Welder E. H. -E- O-4-9746 | Rooke N. (6850) | Marathon Oil Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 22 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,509 | 6,522 | Perforated |
| 6,758 | 6,767 | Perforated |
| 6,848 | 6,853 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 88 | 26 | 233 S |
| 9.625 | 1,141 | 12.25 | 305 S |
| 9.625 | 1,142 | 12.25 | 470 S |
| 2.375 | 6,727 | — | — |
| 5.5 | 7,210 | 8.5 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 26, 1990 | Aug 21, 1989 | — |
| 00 | Oct 18, 1989 | — | — |
| 00 | Jun 19, 1989 | May 30, 1989 | Yes |
| 00 | Jun 3, 1989 | — | — |
| 00 | Jun 23, 1988 | Mar 16, 1988 | Yes |
| 00 | Apr 29, 1988 | — | — |
| 00 | Jan 12, 1984 | Feb 26, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-31462 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-31462 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40931462, documented in the API reference.