TEXAS · WELLS · SAN PATRICIO COUNTY · G-4-117594 LEASE · API 42-409-31682 · DISTRICT 04
Rachal #79
San Patricio County · White Point E. (1710) field · Vertical
Rachal #79 (API 42-409-31682) is a plugged well in San Patricio County, plugged October 17, 1991, last operated by Mobil Producing TX. & N.M. Inc..
The RRC has issued 3 drilling permits between 1982 and 1985, permitted to 12,500 ft.
Operator of record
Mobil Producing TX. & N.M. Inc.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2025
- Permits on file
- 6,763
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.Apr 26, 1985 |
- 12,500
- total depth, ft
- 3
- permits on file
- Apr 26, 1985
- last permit issued
- Feb 23, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 23, 1986
- Shut in
- —
- Plugged
- Oct 17, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-4-117594 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 273322-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jun 21, 1985 | Apr 26, 1985 | — | 9,630 |
| 203206-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jul 28, 1983 | Jul 28, 1983 | — | 9,630 |
| 174118-99 | Drill | Mobil Producing TX. & N.M. Inc. | Oct 13, 1982 | Oct 13, 1982 | — | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 23, 1986 | Rachal G-4-117594 | White Point E. (1710) | Mobil Producing TX. & N.M. Inc. | Plugged | — |
| Jun 25, 1984 | Rachal G-4-113205 | White Point E. (7600) | Mobil Producing TX. & N.M. Inc. | Plugged | — |
| — | White Point Oil&gas G-4-105100 | White Point (9580) | Mobil Producing TX. & N.M. Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,721 | 1,724 | Perforated |
| 1,749 | 1,754 | Perforated |
| 7,782 | 7,790 | Perforated |
| 9,734 | 9,740 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 402 | 26 | 1,500 S |
| 20 | 402 | — | — |
| 13.375 | 4,006 | 17.5 | 3,500 S |
| 13.375 | 4,006 | — | — |
| 2.375 | 9,678 | — | — |
| 9.625 | 9,835 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 3, 1986 | Mar 20, 1986 | Yes |
| 00 | Sep 10, 1985 | Aug 12, 1985 | — |
| 00 | Aug 21, 1985 | — | — |
| 00 | Nov 7, 1984 | Jul 20, 1984 | — |
| 00 | Nov 2, 1984 | Jun 26, 1984 | — |
| 00 | Jan 12, 1984 | Apr 27, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-31682 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-31682 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40931682, documented in the API reference.