WELL · 42-409-31859 · DISTRICT 4

Hunt, Jeffery Davis #1

N

San Patricio County  · Vertical

Hunt, Jeffery Davis #1 (API 42-409-31859) is a permitted well in San Patricio County filed by Xto Energy Inc.; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1983 and 2008, permitted to 10,660 ft.

Completion filings report 5 formation tops, including M-11 Sand, M-11, Frio, Stark.

Its 3 leases have reported 59.5K barrels of oil and 383K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,153 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsProline Energy Resources Incthrough Jun 2024
Latest permitXTO Energy Inc.Jun 16, 2008
10,660
total depth, ft
4
permits on file
Jun 16, 2008
last permit issued
—
completed
59.5K
cumulative oil, bbl
383K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hunt, Jeffery Davis O-4-13504Geronimo, N. (N-2 10300)Proline Energy Resources Inc154.7K276KAug 2008 – Jul 2026
Hunt, Jeffrey D. O-4-12879Geronimo N. (Frio M-11)Vantage Operating, LLC14.8K28KNov 1999 – Jun 2017
Hunt, Jeffery Davis G-4-131201Geronimo N. (Frio M-11)Dreyfus, Louis Natural Gas Corp1079.2KJan 1993 – Apr 2000

Oil, barrels lease total

Last 12 months 0 · prior 12 16(-100%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dreyfus, Louis Natural Gas CorpJan 1993 → Nov 2001
  2. 2Dominion Oklahoma Texas E&P, IncDec 2001 → Jul 2007
  3. 3XTO Energy Inc.Aug 2007 → Oct 2016
  4. 4Vantage Operating, LLCNov 2016 → Nov 2017
  5. 5Proline Energy Resources IncMay 2018 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
663040-99RecompletionXTO Energy Inc.May 27, 2008Jun 16, 2008—10,660
356922-99RecompletionRoyal Oil & Gas Corp.Mar 13, 1989Mar 14, 1989—10,650
231863-99DrillRoyal Oil & Gas Corp.Jan 3, 1984Feb 23, 1984—10,600
221237-99DrillGraham Exploration, Ltd.Nov 18, 1983Nov 18, 1983—10,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-131201————
—— O-4-12879————
—— O-4-13504————

Formation tops

As filed on W-2/G-1. Subsea from 22 ft elevation.Download CSV →

FormationMD ftSubsea
M-11 Sand10,060-10,038
M-1110,061-10,039
FrioFRIO N-210,188-10,166
Stark10,405-10,383
Stark Sand10,405-10,383

Perforations

Perforated and open-hole intervals.

FromToType
10,06110,078Perforated
10,18610,226Perforated
10,18810,198Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,09814.751,180 sx
7.6259,8009.875300 sx
5.510,6506.5400 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 10, 2009Oct 23, 2008Yes
00Dec 3, 2008Dec 6, 1999—
00Jan 21, 2000Dec 6, 1999—
00Dec 30, 1999——
00Jun 5, 1992Jun 1, 1992—
00Aug 28, 1989May 23, 1989Yes
00Jul 26, 1989——
00Aug 1, 1984May 23, 1984—
00Jul 31, 1984May 23, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40931859, documented in the API reference.