TEXAS · WELLS · SAN PATRICIO COUNTY · WELDER, E.H. -E- LEASE · API 42-409-32274 · DISTRICT 04

Welder E.H. -E- #29

Shut in

San Patricio County · Rooke N. (6900) field · Temp Abandoned  · Directional

Welder E.H. -E- #29 (API 42-409-32274) is a well in San Patricio County operated by Mcgowan Working Partners Inc., completed December 14, 1988 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.

The RRC has issued one drilling permit (amended twice), issued October 17, 1988, permitted to 8,148 ft.

It was permitted by Marathon Oil Company and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Completion filings report one formation top, including Frio.

Its lease has reported 5.25K barrels of oil and 71.2K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

McGowan Working Partners Inc.

Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.

Based in
Jackson, MS
P-5 status
Active (A)
P-5 last filed
Oct 27, 2025
Permits on file
60
Phone
(601) 982-3444

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMcGowan Working Partners, Inc.through Sep 1994
Latest permitMarathon Oil CompanyOct 17, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,148
total depth, ft
3
permits on file
Oct 17, 1988
last permit issued
Dec 14, 1988
completed
5.25K
cumulative oil, bbl
71.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1993 THROUGH Sep 1994

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 14, 1988
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Welder, E.H. -E- G-4-129406Rooke, N. (6900)McGowan Working Partners, Inc.15.25K71.2KJan 1993 – Sep 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJul 1993 → Sep 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
352078-97DrillMarathon Oil CompanyJan 3, 1989Oct 17, 1988—8,600
352078-98DrillMarathon Oil CompanyOct 24, 1988Oct 17, 1988—8,600
352078-99DrillMarathon Oil CompanyOct 10, 1988Oct 17, 1988—8,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 14, 1988Welder E.H. -E- G-4-129406Rooke N. (6900)McGowan Working Partners Inc.Temp Abandoned · shut in Jan 1, 19988,148

Formation tops

As filed on W-2/G-1. Subsea from 28 ft elevation.Download CSV →

FormationMD ftSubsea
Frio5,100-5,072

Perforations

Perforated and open-hole intervals.

FromToType
6,8436,850Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,26314.75860 S
2.8757,5149.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 13, 1989Jan 9, 1989Yes
00Jan 14, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40932274, documented in the API reference.