WELL · 42-409-32562 · DISTRICT 4
Hutto #6
San Patricio County · Midway field · Horizontal
Hutto #6 (API 42-409-32562) is a horizontal well in San Patricio County operated by Durango Resources Corp., completed July 15, 1998.
The RRC has issued one drilling permit, issued June 8, 1998, permitted to 6,550 ft.
It was permitted by Goodrich Petroleum Company and has since transferred to Durango Resources Corp. on the wellbore schedule.
Its lease has reported 270K barrels of oil and 5.97K mcf of gas since June 1996, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Goodrich Petroleum Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 1, 2026
- Permits on file
- 18
- Phone
- (281) 558-7998
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Durango Resources Corp. |
| Production reports | Durango Resources Corp.through Feb 2026 |
| Latest permit | Goodrich Petroleum CompanyJun 8, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,550
- total depth, ft
- 1
- permits on file
- Jun 8, 1998
- last permit issued
- Jul 15, 1998
- completed
- 270K
- cumulative oil, bbl
- 5.97K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 15, 1998
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hutto O-4-12579 | Midway | Durango Resources Corp. | 5 | 270K | 5.97K | Jun 1996 – Jul 2026 |
Oil, barrels lease total
Last 12 months 50 · prior 12 51(-2%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Goodrich Pet. Co. of LouisianaJun 1996 → Sep 1996
- 2Goodrich Petroleum CompanyNov 1996 → May 2015
- 3CWS Aceite Operating, Inc.Jun 2015 → May 2017
- 4Sawmill Resources, LLCJun 2018 → Dec 2019
- 5Durango Resources Corp.Feb 2020 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 476122-99 | Drill | Goodrich Petroleum Company | May 8, 1998 | Jun 8, 1998 | Jun 24, 1998 | 6,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-12579 | — | — | — | — |
| — | — O-4-12579 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,590 | 6,480 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 402 | 14.75 | 345 S |
| 7.875 | 5,590 | 9.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 21, 1998 | Aug 19, 1998 | Yes |
| 00 | Oct 14, 1998 | Aug 19, 1998 | Yes |
| 00 | Sep 21, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-32562 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-32562 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40932562, documented in the API reference.