TEXAS · WELLS · SAN PATRICIO COUNTY · MAYO-KOONCE GU LEASE · API 42-409-32729 · DISTRICT 04

Mayo-Koonce GU #3

Shut in

San Patricio County · White Point East (Consolidated) field · Temp Abandoned  · Directional

Mayo-Koonce GU #3 (API 42-409-32729) is a well in San Patricio County operated by Energy Twenty Operating LLC, completed August 21, 2003 and listed as temp abandoned on the RRC schedule, shut in July 1, 2019.

The RRC has issued 2 drilling permits between 2003 and 2009, permitted to 12,330 ft.

It was permitted by El Paso E & P Company, L. P. and has since transferred to Energy Twenty Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Frio, Watson, Anderson.

No lease production has been reported under this well’s leases.

Operator of record

Energy Twenty Operating LLC

Permitted by El Paso E & P Company, L. P.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Nov 9, 2020
Phone
(832) 283-7042

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsFive-Jab, Inc.through Jun 2019
Latest permitEl Paso E & P Company, L. P.Aug 27, 2009
12,330
total depth, ft
2
permits on file
Aug 27, 2009
last permit issued
Aug 21, 2003
completed
0
cumulative oil, bbl
842K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 21, 2003
Shut in
Jul 1, 2019
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mayo-Koonce GU G-4-197769White Point, East (Koonce)Energy Twenty Operating LLC10842KAug 2003 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Peoples Energy Prod.-TX, L.P.Sep 2003 → Sep 2007
  2. 2Coronado Energy E&P Company, LLCOct 2007 → Dec 2010
  3. 3El Paso E & P Company, L. P.Jan 2011 → Jul 2012
  4. 4EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  5. 5Cantera Operating, LLCNov 2013 → Nov 2014
  6. 6EOG Resources, Inc.Dec 2014 → Jun 2018
  7. 7Five-Jab, Inc.Apr 2019 → Jun 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
684487-99RecompletionEl Paso E & P Company, L. P.Aug 25, 2009Aug 27, 2009—12,330
530402-99DrillPeoples Energy Prod.-TX, L.P.Apr 7, 2003Apr 7, 2003Apr 13, 200312,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 21, 2003Mayo-Koonce GU G-4-197769White Point East (Consolidated)Energy Twenty Operating LLCTemp Abandoned · shut in Jul 1, 201912,330

Formation tops

As filed on W-2/G-1. Subsea from 46 ft elevation.Download CSV →

FormationMD ftSubsea
Frio4,980-4,934
Watson9,435-9,389
Anderson9,876-9,830

Perforations

Perforated and open-hole intervals.

FromToType
11,98512,020Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,99517.51,893 S
9.62510,06512.25460 S
7.625—8.5325 S
5.5—6.75150 S
3.5—4.625200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 8, 2004Oct 20, 2003Yes
00Dec 2, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40932729, documented in the API reference.