WELL · 42-409-32848 · DISTRICT 4
Apex GU #2
San Patricio County · Midway South (Consolidated) field · Temp Abandoned · Vertical
Apex GU #2 (API 42-409-32848) is a well in San Patricio County operated by Proline Energy Resources Inc, completed October 16, 2012 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued October 11, 2006, permitted to 14,500 ft.
It was permitted by Eog Resources, Inc. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.
Completion filings report one formation top, including Bank.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Sugar Land, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Phone
- (832) 886-4420
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Proline Energy Resources Inc |
| Production reports | EOG Resources, Inc.through Jun 2015 |
| Latest permit | EOG Resources, Inc.Oct 11, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,500
- total depth, ft
- 1
- permits on file
- Oct 11, 2006
- last permit issued
- Oct 16, 2012
- completed
- 0
- cumulative oil, bbl
- 1.49M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 16, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Apex GU G-4-224307 | Midway, S. (Shell Deep II) | Proline Energy Resources Inc | 1 | 0 | 1.49M | Jan 2007 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Jan 2007 → Jun 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 625970-99 | Drill | EOG Resources, Inc. | Sep 14, 2006 | Oct 11, 2006 | Nov 25, 2006 | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-224307 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 39 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bank | 12,400 | -12,361 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,423 | 12,438 | Perforated |
| 12,568 | 12,948 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5 | 1 | — | — |
| 10.75 | 2,519 | 14.75 | 1,570 S |
| 5 | 10,230 | 6.5 | 705 S |
| 7.625 | 10,444 | 9.875 | 910 S |
| 5 | 13,130 | 6.5 | 705 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 29, 2013 | Oct 25, 2012 | — |
| 00 | Jul 26, 2013 | Oct 8, 2012 | — |
| 00 | Apr 27, 2007 | Feb 1, 2007 | Yes |
| 00 | Feb 6, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-32848 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-32848 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40932848, documented in the API reference.