TEXAS · WELLS · SAN PATRICIO COUNTY · ELICK LEASE · API 42-409-32992 · DISTRICT 04
Elick #3
San Patricio County · Midway East (Frio Cons.) field · Producing · Horizontal
Elick #3 (API 42-409-32992) is a horizontal well in San Patricio County operated by Orx Resources L.L.C., completed April 8, 2013 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued February 25, 2013, permitted to 11,913 ft.
It was permitted by Eog Resources, Inc. and has since transferred to Orx Resources L.L.C. on the wellbore schedule.
Completion filings report 3 formation tops, including Ritchie, Lower Guedin, Lower Herrin.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 2, 2025
- Permits on file
- 1
- Phone
- (346) 444-3320
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Orx Resources L.L.C. |
| Production reports | Orx Resources, L.L.C.through Apr 2026 |
| Latest permit | EOG Resources, Inc.Feb 25, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,913
- total depth, ft
- 1
- permits on file
- Feb 25, 2013
- last permit issued
- Apr 8, 2013
- completed
- 0
- cumulative oil, bbl
- 8.03M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 8, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Elick G-4-270167 | Midway, East (Frio Cons.) | Orx Resources, L.L.C. | 1 | 0 | 8.03M | Apr 2013 – Jul 2026 |
Gas, mcf lease total
Last 12 months 6,536 · prior 12 3,714(+76%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Apr 2013 → Feb 2019
- 2Five-Jab, Inc.Mar 2019 → Jan 2020
- 3Petrodome Operating, LLCFeb 2020 → Feb 2022
- 4Orx Resources, L.L.C.May 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 757316-99 | Drill | EOG Resources, Inc. | Feb 21, 2013 | Feb 25, 2013 | Mar 6, 2013 | 13,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 8, 2013 | Elick G-4-270167 | Midway East (Frio Cons.) | Orx Resources L.L.C. | Producing | 11,913 |
Formation tops
As filed on W-2/G-1. Subsea from 22 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Ritchie | 10,770 | -10,748 |
| Lower Guedin | 11,050 | -11,028 |
| Lower Herrin | 11,390 | -11,368 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,804 | 11,568 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,116 | 12.25 | 825 S |
| 7 | 10,555 | 8.75 | 580 S |
| 3.5 | 12,100 | 6.25 | 265 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 14, 2013 | May 17, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-409-32992 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-409-32992 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40932992, documented in the API reference.