TEXAS · WELLS · SCHLEICHER COUNTY · THOMERSON, A. B., ESTATE LEASE · API 42-413-00060 · DISTRICT 6E

Thomerson A. B. Estate #2

Plugged

Schleicher County · Toe Nail (Harkey) field  · Vertical

Thomerson A. B. Estate #2 (API 42-413-00060) is a plugged well in Schleicher County, plugged August 24, 1994, last operated by Devon Energy Corporation(Nevada).

The RRC has issued one drilling permit, issued September 21, 1978, permitted to 5,285 ft.

It was permitted by Atlantic Richfield CO. and has since transferred to Devon Energy Corporation(Nevada) on the wellbore schedule.

Operator of record

Devon Energy Corporation(nevada)

Permitted by Atlantic Richfield Co.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Inactive (I)
P-5 last filed
Feb 4, 2000
Permits on file
171
Phone
(405) 235-3611

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitAtlantic Richfield Co.Sep 21, 1978
5,285
total depth, ft
1
permits on file
Sep 21, 1978
last permit issued
Jan 12, 1959
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 12, 1959
Shut in
—
Plugged
Aug 24, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thomerson, A. B., Estate G-9-19350Toe Nail (Harkey)Devon Energy Corporation(nevada)100Jan 1993 – Aug 1994

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
33237-99OtherAtlantic Richfield Co.Sep 21, 1978Sep 21, 1978—5,285

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 12, 1959Thomerson A. B. Estate G-9-19350Toe Nail (Harkey)Devon Energy Corporation(nevada)Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,5904,610Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41300060, documented in the API reference.